CHP and autogeneration

2 unique locations (114 components)

Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3488.59 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (57 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.92 MW
Loading map...
Showing 2 locations