Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

15 unique locations (58 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Young's House, Wickham Road, Grimsby DN32 8HW (4 components)
• On-site Generating CMU (2)
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.22 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (3 components)

New-Build CHP Generating Unit at Berry Wicks Farm. (2)

Active • 2028-29 (T-4), 2026-27 (T-1) ...
2.51 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (6 components)
• On-Site Generating CMU. (2)
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
79.47 MW
Syensqo Oldbury, Trinity St, Oldbury, B69 4LN (3 components)

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD048 / GB2548 B69
Active • 2029-30 (T-4), 2026-27 (T-1) ...
2.24 MW
Staithes Road, Preston, East Riding of Yorkshire HU12 8TB (4 components)

On-Site Generating CMU.

Active • 2029-30 (T-4), 2026-27 (T-1) ...
5.89 MW
Speke Blvd, Speke, Liverpool L24 9LE (3 components)
• on site generating CMU (2)
• On-site Generating CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.61 MW
Sapphire Mill, Glenwood Rd, Leslie, Glenrothes KY6 3AB (3 components)

Existing Generating CMU/

Active • 2029-30 (T-4), 2026-27 (T-1) ...
3.71 MW
Repton Rd (Adjacent to Plastic Omnium Site), Measham DE12 7DT (4 components)

On-Site Generating CMU.

Active • 2029-30 (T-4), 2026-27 (T-1) ...
5.67 MW
Morrisons Farmers Boy, Cemetery Road, Greenside Park, Bradford BD8 9RU (4 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2026-27 (T-1) ...
5.32 MW
Donaldsons Nursery, Vinnetrow Road, Runcton, Chichester PO20 1QD (3 components)

Existing Generating CHP

Active • 2029-30 (T-4), 2026-27 (T-1) ...
4.18 MW
Clough Green, Cawthorne, Barnsley, S75 4AD (5 components)

On-site Generating CMU.

Active • 2029-30 (T-4), 2026-27 (T-1) ...
3.76 MW
Clay Wheels Ln, Wadsley Bridge S6 1LY (3 components)
• On-Site Generating CMU
• new build on site generating CMU
Active • 2027-28 (T-4), 2026-27 (T-1) ...
3.69 MW
96 Kings Rd, Immingham DN40 1QS (3 components)
• Existing Generating CHP
• New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU GB2502 DN40
Active • 2028-29 (T-4), 2026-27 (T-1) ...
6.77 MW
5 Coulman St, Thorne, Doncaster DN8 5JT (3 components)
• On-Site Generating CMU
• new build on site generating CMU
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU On-Site Energy - Chesterfield Poultry DN8
Active • 2027-28, 2026-27 ...
2.75 MW
2 Samworth Way, Melton Mowbray LE13 1GA (7 components)

Existing Generation on existing site - CHP

Active • 2029-30, 2028-29 ...
9.34 MW
Loading map...
Showing 15 locations