CHP and autogeneration

13 unique locations (609 components)

Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (20 components)
• 1 x OCGT
• A site with two gas engine CHPs, providing hot water to a local district heating network
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
9.03 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (22 components)
• Existing Generation on existing site - CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
Active • 2027-28 (T-4), 2025-26 (T-4) ...
43.59 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (19 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• Keadby GT3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
132.13 MW
Saltend Power Station Saltend Hull HU12 8GA (30 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3486.78 MW
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (23 components)
• 0.725MW Combined Heat and Power Plant Royal South Hants Hospital
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2025-26 (T-4), 2024-25 (T-4) ...
47.83 MW
Manchester Rd, Carrington, Manchester M31 4TG (32 components)
• 2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
12.59 MW
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (76 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2025-26 (T-1), 2024-25 (T-1) ...
98.70 MW
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (27 components)
• New build onshore wind farm project. 13 no. wind turbine generator wind farm with an installed capacity of 62.4MW located in South Lanarkshire, Southern Scotland
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
• One of three CHP in a horticultural environment.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.65 MW
Land north of the railway Line, Bellamour Lane, Wolsey Bridge  WS15 3JS (17 components)
• Component has yet to be procured.
• Gas peaking reciprocating engine
• N/A
Active • 2026-27 (T-4), 2025-26 (T-4) ...
190.51 MW
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (23 components)
• Generating Unit 2
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
28.28 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
13899.76 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
1 Thane Road West, Nottingham, NG2 3AA (125 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
101.02 MW
Loading map...