Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

7 unique locations (322 components)

1 Thane Road West, Nottingham, NG2 3AA (125 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
101.02 MW
EMR Landor Street , Landor Street, Nechells , B8 1AF (22 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 4.00 MW and a net power capacity of 3.960 MW.
• Component has yet to be procured.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.84 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (68 components)
• Longannet coal fired power station - Unit 3
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
18.40 MW
London Rd, Purfleet RM19 1SD (24 components)

Gas-fired CHP unit

Inactive • 2023-24 (T-1), 2022-23 (T-3) ...
29.12 MW
Port Causeway Bromborough Merseyside CH62 4TH (31 components)

Turbomach M50 Natural Gas fired CHP unit

Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
16.14 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (35 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
23.13 MW
University of East Anglia, Norwich Research Park, Norwich, NR4 7TJ (17 components)
• CHP
• Turbomach M50 Natural Gas fired CHP unit
Active • 2024-25 (T-4), 2024-25 (T-1) ...
14.53 MW
Loading map...
Showing 7 locations