Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

8 unique locations (86 components)

Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
Airbus UK, Chester Road, Broughton, CH4 0DR (4 components)

8 Gas-fired CHP units

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land on the south east side of Rycote Lane, Milton Common, Thame,  OX9 2PB (11 components)
• Battery Energy Storage System
• Gas peaking reciprocating engine
• Little Barford 1 OCGT . fuel type is distillate
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
New Victoria Park, Grange Road, Glasgow, G42 9LF (19 components)
• Component has yet to be procured.
• Generators at hospital site
• The CMU component BARR17 will consist of one CHP engine with a generation capacity of 4.5 MW.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
3.41 MW
Stockport Metropolitan Borough Council, Stopford House, Edward Street, Stockport, SK1 3UR (10 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Stockport DSR
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
29.10 MW
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (8 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London
• Gas Fired - CHP
• Ratcliffe Unit 4 coal-fired unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Toray 2, Toray Textiles, Import Way Crown Farm Way Mansfield NG19 0FN (3 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• gas generation
Inactive • 2021-22 (T-4)
Waddon Marsh Purley Way Croydon CR0 4NX (2 components)
• A reciprocating gas engine CHP providing hot water to a local heat network
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.09 MW
Loading map...
Showing 8 locations