CHP and autogeneration
128 unique locations (2226 components) - Page 1 of 6
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
Withyhedge Lanfill, Rudbaxton, Haverfordwest,Pembrokshire Sa62 4DB (1 component)
Engine set
Withyhedge Landfill site, Rudbaxton, Haverfordwest SA62 4DB (1 component)
Engine generator sets
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (28 components)
The CMU is a gas fired CCGT CHP
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (43 components)
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (17 components)
Warehouse R Royal Victoria Dock Northside London E16 1BA (6 components)
1.2MW Combined Heat and Power Engine
Waddon Marsh Purley Way Croydon CR0 4NX (2 components)
A reciprocating gas engine CHP providing hot water to a local heat network
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (14 components)
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (19 components)
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (41 components)
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (12 components)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (17 components)
Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …
Staverton, Trowbridge, Wiltshire, BA14 6PH (34 components)
Turbomach M50 Natural Gas fired CHP unit
Station Road, Wigton, Cumbria CA7 9BG (58 components)
Speke Operations, Fleming Rd, Liverpool L24 9LN (9 components)
Southport & Formby District General hospital, Town Lane Kew, Southport PR8 6PN (4 components)
Gas reciprocating engine.
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (14 components)
SO45 1TX (3 components)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (2 components)
10.754 MW CHP Plant with 2 new Gas Turbines
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (17 components)
Showground Road, Bridgwater, TA6 6AJ (2 components)
An energy from waste development situated on Showground Road, Bridgwater with an export capacity of 7.75 MWe
Shelton Road, Willowbrook Industrial Estate, Corby, Northamptonshire, NN17 5XH (1 component)
The CMU will be an energy from waste generator and will consist of a steam turbine