CHP and autogeneration

128 unique locations (2226 components) - Page 1 of 6

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
167.38 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (43 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
86.63 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (17 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.74 MW
Warehouse R Royal Victoria Dock Northside London E16 1BA (6 components)

1.2MW Combined Heat and Power Engine

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Waddon Marsh Purley Way Croydon CR0 4NX (2 components)

A reciprocating gas engine CHP providing hot water to a local heat network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.17 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (14 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (19 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (41 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
21.41 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (12 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
11.64 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (17 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.10 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (34 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
19.17 MW
Station Road, Wigton, Cumbria CA7 9BG (58 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2025-26 (T-4), 2024-25 (T-4) ...
49.50 MW
Speke Operations, Fleming Rd, Liverpool L24 9LN (9 components)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807
• Speke combined heat and power plant.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Southport & Formby District General hospital, Town Lane Kew, Southport PR8 6PN (4 components)

Gas reciprocating engine.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (14 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
• 2*2 gas reciprocating engines with a total gross power capacity of 4.00 MW and a net power capacity of 3.960 MW.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.63 MW
SO45 1TX (3 components)
• TG1B is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which TG1B of medium size. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - Unit 3).
• Unit 3 is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - TG1B).
• Unit 5 is part of the aggregated CMU EM3-21, which made up of 3 Generating Units of which Unit 5 is the largest. This Generating Unit forms the E_FAWN-1 BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (MSID 7081). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW.
Inactive • 2021-22 (T-4)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (2 components)

10.754 MW CHP Plant with 2 new Gas Turbines

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (17 components)
• 8.300MW Gas Turbine installation
• 8.3MW Gas Turbine installation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Showground Road, Bridgwater, TA6 6AJ (2 components)

An energy from waste development situated on Showground Road, Bridgwater with an export capacity of 7.75 MWe

Inactive • 2021-22 (T-4)
Shelton Road, Willowbrook Industrial Estate, Corby, Northamptonshire, NN17 5XH (1 component)

The CMU will be an energy from waste generator and will consist of a steam turbine

Inactive • 2021-22 (T-4)