Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
167.38 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (43 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
86.63 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (17 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.74 MW
Warehouse R Royal Victoria Dock Northside London E16 1BA (6 components)

1.2MW Combined Heat and Power Engine

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (14 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (19 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (41 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
21.41 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
Stoneykirk Road, Stranraer, DG9 7BU (23 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
7.16 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (17 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.10 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (34 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
19.17 MW
Station Road, Wigton, Cumbria CA7 9BG (58 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2025-26 (T-4), 2024-25 (T-4) ...
49.50 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (25 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
184.43 MW
Seal Sands, Middlesbrough, TS2 1UB (28 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.23 MW
Seal Sands, Middlesborough, TS2 1UB (28 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.23 MW
School Road, Aberdeen AB24 1TU (23 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.22 MW
Saltend Power Station Saltend Hull HU12 8GA (39 components)
• Unit 1 at Saltend Power Station
• Unit 1 at Saltend Power Station.
• Unit 2 at Saltend Power Station
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2187.45 MW
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (12 components)

Two gas CHP in a horticultural environment with no aux load

Active • 2025-26 (T-4), 2024-25 (T-4) ...
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (20 components)

Energy from Waste Recovery Facility

Active • 2028-29 (T-4), 2027-28 (T-4) ...
275.36 MW
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (18 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
82.56 MW
Repton Road, Measham, Swadlincote, DE12 7DT (20 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
3.51 MW
Priory Street, Ware, Hertfordshire, SG12 0DJ (17 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...