CHP and autogeneration

16 unique locations (67 components)

Active MW: 12971.49 MW
Inactive MW: 157.64 MW
Birds Eye Limited. Whapload Road, Lowestoft, Suffolk NR32 1XQ (3 components)
• 3.348 MW gas engine CHP plant (2)
• 1 x 3.3 MW gas engine CHP plant
CHP and autogeneration LIMEJUMP LTD Existing Generating CMU EXC_02 Rejected NR32
Inactive • 2021-22 (T-4), 2018-19 (T-1) ...
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (2 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS (2)

CHP and autogeneration GRANGEMOUTH CHP LIMITED Existing Generating CMU Grangemouth CHP Grangemouth CHP FK3
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (5 components)
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2 (2)
• Gas turbine generator 6.4MWe CHP BABR-1
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST02 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more BD12
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cleckheaton Road, Low Moor Bradford BD12 0JZ (3 components)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe) BABR-1_1 (2)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe)
CHP and autogeneration Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST02 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +1 more BD12
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (5 components)
• Steam Turbine (2)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST03 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more BD12
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
COFELY Great Coates, Grimsby, DN31 2TT (15 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks (2)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Glasshouse Energy Centre Wight Salads Nursery/Macketts Land Nursery Macketts Lane, Hale Common, Newport, Isle of Wight PO30 3AS (4 components)
• The CMU GLAS16 consists of two identical components, with each CHP engine delivering 5.5MW. The total CMU generation capacity is declared 11MW. The new development of two CHP engines which will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS01 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS02 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
CHP and autogeneration GLASSHOUSE GENERATION LIMITED Existing Generating CMU Glasshouse Energy Centre Glasshouse Energy Centre PO30
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Glenfield Hospital, Groby Road, Leicester, LE3 9QP (2 components)
• CHP Unit
• Gas Fired CHP
CHP and autogeneration KIWI POWER LTD Existing Generating CMU CMU - Existing Generation KPEG07 LeicsNHS LE3
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Imerys Minerals, Treviscoe, Little Treviscoe - St.Austell PL26 7QN (3 components)

3.3 MWe Gas Engine (3)

CHP and autogeneration Combined Heat and Power (CHP) Imerys Minerals Limited Existing Generating CMU Treviscoe Dryer CHP Treviscoe Dryer CHP PL26
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Kemsley Mill, SittingBourne, Kent, ME10 2TD (3 components)
• One 40MWe gas Turbine Generation unit (2)
• One 40MWe gas Turbine Generation unit which is part of the Kemsley 1 CHP Plant
CHP and autogeneration Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST05 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +1 more ME10
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (6 components)
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Combined Heat and Power (CHP) THE ISLE OF WIGHT ENERGY COMPANY LIMITED Existing Generating CMU Main Site Energy Centre Main Site Energy Centre PO30
Inactive • 2019-20 (T-1), 2017-18 (T-1)
Par Docks, Par, Cornwall PL24 2SQ (6 components)
• One 3.7 MWe gas fired CHP (Centrax KB5) (2)
• Two 3.7 MWe gas fired CHP
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Rocks Dryer, Rosevear Road, Bugle - St.Austell PL268PJ (3 components)

One 3.7 MWe gas fired CHP (Centrax KB5) (3)

CHP and autogeneration Combined Heat and Power (CHP) Imerys Minerals Limited Existing Generating CMU Rocks Dryer CHP Rocks Dryer CHP PL26
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (3 components)

Energy from Waste Recovery Facility (3)

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (2 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Combined Heat and Power (CHP) Sembcorp Utilities (UK) Limited Existing Generating CMU Sembcorp Wilton GT2 Sembcorp Wilton GT2 TS90
Inactive • 2019-20 (T-1), 2017-18 (T-1)
Warehouse R Royal Victoria Dock Northside London E16 1BA (2 components)

1.2MW Combined Heat and Power Engine (2)

CHP and autogeneration EXCEL DISTRICT ENERGY COMPANY LIMITED Existing Generating CMU EDEC EDEC Rejected E16
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Loading map...
Showing 16 locations