Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

47 unique locations (784 components) - Page 1 of 2

Academy Way, Dagenham, London, RM8 2BF (15 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network. (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
2.64 MW
Akerman Road, Lambeth, London, SW9 6SN (9 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network. (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1.63 MW
Barrow Man Road Birchington Kent CT7 0AX (12 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.73 MW
Birds Eye Limited. Whapload Road, Lowestoft, Suffolk NR32 1XQ (8 components)
• 1 x 3.3 MW gas engine CHP plant
• 3.348 MW gas engine CHP plant
Inactive • 2021-22 (T-4), 2018-19 (T-1) ...
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (3 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Buckland Gardens, Broadway, Worcestershire WR12 7LY (10 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 1.935MW CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (13 components)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.28 MW
Cleckheaton Road, Low Moor Bradford BD12 0JZ (9 components)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe) BABR-1_1
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
7.28 MW
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (16 components)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
• Steam Turbine
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.28 MW
COFELY Great Coates, Grimsby, DN31 2TT (91 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
5.38 MW
Devons Road, Bromley by Bow, London, E3 3BF (14 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1.00 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (69 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G2 6,8 MWe
• ... and 2 more unique descriptions
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
50.48 MW
Edgabaston, Birmingham, West Midlands, B15 2TT (40 components)
• Gas Engine
• Gas Turbine Generator
• Gas engine
• ... and 1 more unique description
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
47.35 MW
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (24 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Fellside CHP Sellafield Ltd Seascale Cumbria CA20 1PG UK (5 components)

Fellside CHP is located in Seascale- Cumbria- UK and consists of three GE Frame 6581B gas turbines which are able to run on natural gas or distillate. The primary purpose …

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Gibbet Hill Road, Coventry, West Midlands, CV4 7AL (32 components)

One of six CHP units at University of Warwick, Gibbet Hill Road, Coventry, West Midlands, CV4 7AL

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Glasshouse Energy Centre Wight Salads Nursery/Macketts Land Nursery Macketts Lane, Hale Common, Newport, Isle of Wight PO30 3AS (6 components)
• The CMU GLAS16 consists of two identical components, with each CHP engine delivering 5.5MW. The total CMU generation capacity is declared 11MW. The new development of two CHP engines which will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS01 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS02 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Glasshouse Energy Centre Wight Salads Nursery/Macketts Land Nursery Macketts Lane, Hale Common, Newport, Isle of Wight PO30 3AS (9 components)
• The CMU GLAS16 consists of two identical components, with each CHP engine delivering 5.5MW. The total CMU generation capacity is declared 11MW. The new development of two CHP engines which will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS01 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS02 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Glenfield Hospital, Groby Road, Leicester, LE3 9QP (7 components)
• CHP Unit
• Gas Fired CHP
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Honiton Road, Cranbrook, Exeter, EX5 2DX (15 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network. A solar PV installation is also installed on site, but is metered seperately to the CHP (see SLD).
• A reciprocating gas engine CHP site providing hot water to a local district heating network. A solar PV installation is also installed on site.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1.00 MW
INEOS Nitriles (UK) Limited Seal Sands, P.O. Box 62 Middlesbrough, Cleveland TS2 1UB (4 components)

CHP - Auxillary load behind boundary meter - Location TS2 1UB

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
James Cropper Plc, Burneside Mills, Kendal, LA9 6PZ (18 components)
• Gas fired CHP Unit
• Steam Turbine driven by gas fired CHP (component ID KPEG13)
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Joslin Avenue, Barnet, London, NW9 5HB (14 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel.
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1.00 MW
Loading map...
Showing 25 locations