Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

47 unique locations (784 components) - Page 1 of 2

Warehouse R Royal Victoria Dock Northside London E16 1BA (6 components)

1.2MW Combined Heat and Power Engine

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Warehouse R Royal Victoria Dock Northside London E16 1BA (3 components)

1.2MW Combined Heat and Power Engine

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (14 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (5 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2025-26 (T-1), 2019-20 (T-1) ...
1.35 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (34 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
15.21 MW
Seal Sands, Middlesbrough, TS2 1UB (28 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.23 MW
Seal Sands, Middlesborough, TS2 1UB (28 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.23 MW
Sallow Rd, Weldon Ind Est, Corby Northants, NN17 5JX (13 components)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network.

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (18 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
82.56 MW
Rocks Dryer, Rosevear Road, Bugle - St.Austell PL268PJ (6 components)

One 3.7 MWe gas fired CHP (Centrax KB5)

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Rocks Dryer, Rosevear Road, Bugle - St.Austell PL268PJ (5 components)

One 3.7 MWe gas fired CHP (Centrax KB5)

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Porters Way, Hillingdon, Greater London, UB7 9AA (10 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.67 MW
Port Causeway Bromborough Merseyside CH62 4TH (34 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
16.14 MW
Par Docks, Par, Cornwall PL24 2SQ (18 components)
• One 3.7 MWe gas fired CHP (Centrax KB5)
• Two 3.7 MWe gas fired CHP
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
6.73 MW
Par Docks, Par, Cornwall PL24 2SQ (13 components)
• One 3.7 MWe gas fired CHP (Centrax KB5)
• Two 3.7 MWe gas fired CHP
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Ottringham Road Keyingham Hull North Humberside HU12 9RX (10 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (14 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1.00 MW
Midland Road, Bath, BA2 3EW (14 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1.00 MW
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (27 components)
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 4.981MW and additional PSEUDO MPAN's are fitted.
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 5.535MW and additional PSEUDO MPAN's are fitted.
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• ... and 2 more unique descriptions
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (16 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (4 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Kemsley Mill, SittingBourne, Kent, ME10 2TD (10 components)
• One 40MWe gas Turbine Generation unit
• One 40MWe gas Turbine Generation unit which is part of the Kemsley 1 CHP Plant
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
10.93 MW
Joslin Avenue, Barnet, London, NW9 5HB (14 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel.
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1.00 MW
James Cropper Plc, Burneside Mills, Kendal, LA9 6PZ (18 components)
• Gas fired CHP Unit
• Steam Turbine driven by gas fired CHP (component ID KPEG13)
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
INEOS Nitriles (UK) Limited Seal Sands, P.O. Box 62 Middlesbrough, Cleveland TS2 1UB (4 components)

CHP - Auxillary load behind boundary meter - Location TS2 1UB

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations