Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

67 unique locations (1157 components) - Page 1 of 3

Active MW: 229775.30 MW
Inactive MW: 33894.12 MW
111 Brancroft Way, Enfield, Middlesex, EN3 7PL (11 components) Geocoding Needed

Enfield CCGT Power Station - (one unit station)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
2274.42 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components) Geocoding Needed
β€’ 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
β€’ 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
β€’ One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT) CARRINGTON STORAGE LIMITED CARLTON ENERGY NO: 5 LIMITED New Build Generating CMU Trafford Power Battery Storage Unit 1 Trafford Power Battery Storage Unit 1 +15 more M31
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
6769.88 MW
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF (3 components) Geocoding Needed

Combined Cycle Gas Turbine

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Rye House Rye House EN11
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
1290.45 MW
Abergelli Power Station, Felindre, Swansea, SA5 7NN (5 components) Geocoding Needed
β€’ A new Open Cycle Gas Turbine (OCGT) peaking power plant
β€’ A new Open Cycle Gas Turbine (OCGT) power peaking plant
Open Cycle Gas Turbine (OCGT) ABERGELLI POWER LIMITED New Build Generating CMU Abergelli OCGT Abergelli OCGT +2 more SA5
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
1138.74 MW
Aberthaw Power Station, The Leys, Aberthaw, Barry, Mid Glamorgan, CF62 4ZW (48 components) Geocoding Needed
β€’ Aberthaw 7 Coal fired unit
β€’ Aberthaw 8 OCGT fuel is distillate
β€’ Aberthaw 9 Coal fired unit
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
4925.44 MW
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (10 components) Geocoding Needed
β€’ Small gas fired CCGT.
β€’ Small gas fired OCGT.
Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Existing Generating CMU Thornhill CCGT Thornhill OCGT +4 more WF12
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
267.61 MW
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (11 components) Geocoding Needed
β€’ Existing OCGT
β€’ The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
β€’ The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
439.71 MW
Baglan Bay Power Station, Baglan Energy Park, Port Talbot, SA12 7GE (18 components) Geocoding Needed
β€’ Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
β€’ Existing CCGT Baglan Unit 1
β€’ Existing OCGT module
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
577.12 MW
Basin Road South, Portslade, East Sussex, BN41 1WF (7 components) Geocoding Needed
β€’ Combined Cycle Gas Turbine plant
β€’ Existing Combined Cycle Gas Turbine plant
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Shoreham Shoreham +4 more BN41
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
2308.93 MW
Brentfield Road, Willesden, London, NW10 8JP (22 components) Geocoding Needed
β€’ Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
β€’ Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
β€’ Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
1284.86 MW
Carrington Power Station, 132 Manchester Road, Carrington, Manchester, M31 4AY, United Kingdom (28 components) Geocoding Needed
β€’ The CMU component is a combined cycle gas turbine
β€’ This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
β€’ This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7531.31 MW
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (11 components) Geocoding Needed

Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
1172.84 MW
Chase Hill Road, Killingholme, North Lincolnshire, DN40 3LU (26 components) Geocoding Needed
β€’ Killingholme Module 1 converted to open cycle operation
β€’ Killingholme Module 2 converted to open cycle operation
β€’ Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
4447.95 MW
Cheshire Power Station, North Road, Ellesmere Port, South Wirral, CH65 1AF (10 components) Geocoding Needed
β€’ Modular reciprocating engines
β€’ One (1) Open Cycle Gas Turbine MSID: 7382
β€’ One (1) Open Cycle Gas Turbine MSID: 7382
Active β€’ 2028-29 (T-4), 2025-26 (T-1) ...
398.78 MW
Clough Lane, North Killingholme, North Lincolnshire, DN40 3JP (7 components) Geocoding Needed

A combined cycle gas turbine generating plant

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
3072.70 MW
Cottam Development Centre Power Station, Cottam, Retford, DN22 0TF (9 components) Geocoding Needed

Cottam Development Centre (CDC) CCGT single unit station

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
1962.75 MW
Cowes Power Station, Kingston Road, East Cowes, Isle of Wight, PO32 6JS (23 components) Geocoding Needed
β€’ Cowes 1 - OCGT, fuel is distillate
β€’ Cowes 1 - OCGT, fuel is distillate MSID: 4548
β€’ Cowes 2 - OCGT, fuel is distillate MSID: 4548
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
1285.79 MW
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (12 components) Geocoding Needed

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near …

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7458.25 MW
Didcot B Power Station, Milton Road, Didcot, Oxfordshire, OX11 7YU (18 components) Geocoding Needed
β€’ Didcot B5 - CCGT MSID: 4055
β€’ Didcot B6 - CCGT
β€’ Didcot B6 - CCGT MSID: 4055
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
12492.50 MW
Didcot OCGT Power Station, Didcot, Oxfordshire, OX11 7HA (44 components) Geocoding Needed
β€’ Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
β€’ Didcot 3 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
β€’ Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
947.80 MW
Drakelow Power Station, Burton on Trent, DE15 9TZ (5 components) Geocoding Needed

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.

Combined Cycle Gas Turbine (CCGT) Powersite DL Ltd New Build Generating CMU Powersite DL Ltd Powersite DL Ltd +3 more Conditional DE15
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
1755.00 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (46 components) Geocoding Needed
β€’ West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-1 = 100% (T_WBUGT-1)
β€’ West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
β€’ West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Coal Open Cycle Gas Turbine (OCGT) EDF ENERGY (THERMAL GENERATION) LIMITED Existing Generating CMU West Burton A Power Station CMU 1 West Burton A Power Station CMU 1 +11 more DN22
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
3081.02 MW
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (12 components) Geocoding Needed
β€’ West Burton B Power Station CMU 1 WB1-20= 100% T_WBURB-1
β€’ West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
β€’ West Burton B Power Station CMU 3 WB3-20= 100% T_WBURB-3
Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED Existing Generating CMU West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +7 more DN22
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
3738.15 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (45 components) Geocoding Needed
β€’ Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
β€’ New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
β€’ New build gas-fired generation at Eggborough power station.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
11967.48 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (5 components) Geocoding Needed

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Combined Cycle Gas Turbine (CCGT) EP UK Power Development II Ltd Existing Generating CMU South Humber Bank DN41
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
1260.00 MW
Loading map...
Showing 25 locations