Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

260 unique locations (934 components) - Page 1 of 11

Yorkshire Way, Armthorpe, Doncaster DN3 3GW (1 component)

Behind-the-meter battery storage system at IKEA's Doncaster distribution centre

Inactive • 2021-22 (T-4)
0.13 MW
Yard (see map) near to 137 Netherton Street, Wishaw, ML2 0EY (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2021-22 (T-4), 2018-19 (T-1)
6.38 MW
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (11 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
13.51 MW
Withyhedge Landfill Site, Rudbaxton, Haverfordwest, Pembrokshire SA62 4DB SM 972 215 (1 component)

Battery Storage at 2.5MWh Capacity

Inactive • 2021-22 (T-4)
0.67 MW
0.67 MW
Whelley Hill Farm Battery Storage Scheme, Worset Lane, Hart, Hartlepool, TS27 3BH. (1 component)

A 4.8MW Battery Energy Storage System.

Inactive • 2021-22 (T-4)
1.75 MW
West Burton Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (4 components)
• West Burton B Power Station CMU 4 [WB4C16] (New build battery storage project)
• West Burton B Power Station CMU 4 [WB4C17] (New build battery storage project)
Inactive • 2020-21 (T-4), 2018-19 (T-1)
57.64 MW
Wellington Street, Oldham, OL4 1RL (1 component)

Battery Storage Facility

Battery Not Prequalified OL4
Inactive • 2021-22 (T-4)
1.07 MW
Watts Lydney, 16 Mead Lane, Lydney, GL15 5EN (1 component)

The CMU component at Watts Lydney is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Inactive • 2021-22 (T-4)
3.64 MW
Waters Meeting Road, Bolton, BL1 8HQ (2 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets
Inactive • 2021-22 (T-4)
0.07 MW
Valley Park Inverkip Road Greenock PA16 0AH (2 components)
• 15 MW Storage battery located at Greenock
• 18 MW storage battery located at Greenock
Inactive • 2021-22 (T-4)
12.03 MW
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (11 components)

10MW battery energy storage facility at Upton Lane, Rownhams

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
16.61 MW
Unnamed Road Dunblane FK15 9RD (1 component)

9.999 MW Battery Storage unit located at Dunblane.

Inactive • 2021-22 (T-4)
3.64 MW
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (3 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
23.60 MW
Unit 5, The Bloxwich Lane Estate, Walsall, WS2 8TF (4 components)

Battery Energy Storage System

Inactive • 2021-22 (T-4), 2019-20 (T-1)
41.94 MW
Unit 49 The Pensnett Estate, Kingswinford West Midlands DY6 7NA (1 component)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
26.09 MW
Unit 3, Wallbridge Industrial Estate, Wallbridge, Stroud, Gloucestershire, GL5 3JU (4 components)

This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.82 MW
Unit 30, New York Way, New York Industrial Park, NE27 0QF (1 component)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
26.09 MW
Unit 2, Sentinel House, Enigma Business Park, WR14 1GL (2 components)

Battery Energy Storage System

Inactive • 2022-23 (T-4), 2021-22 (T-4)
47.83 MW
Unit 23B, South Gyle Crescent, Edinburgh, EH12 9EQ (1 component)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
5.23 MW
Unit 23 B, South Gyle Crescent, Edinburgh, EH12 9EQ (2 components)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
26.04 MW
Unit 1 Junction Lane, Newton-le-Willows, Merseyside, WA12 8DN. (1 component)

The batteries are housed in 1 No ISO container with an additional container used to house converters. The batteries will be installed in the containers on-site and the complete battery …

Battery Shaw-Energi Ltd Not Prequalified WA12
Inactive • 2021-22 (T-4)
0.54 MW
Unit 13 Newby Road Industrial Estate Hazel Grove Stockport SK7 5DA (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
1.07 MW
Unit 10 Ventura Business Park Carterton OX18 1AD (1 component)

A 7MW Energy storage system located at Carterton

Battery BSR Energy Limited Not Prequalified OX18
Inactive • 2021-22 (T-4)
2.55 MW
Twibell Street, Barnsley S71 1JE (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
8.08 MW
Loading map...
Showing 25 locations