Battery

1660 unique locations (3219 components) - Page 67 of 67

Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (6 components)

8MW Energy Storage facility located in Harrogate. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Worset Lane Hartlepool TS27 3BL (1 component)

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 37.5 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

Active • 2025-26 (T-4)
Wren Close, Leicester, Leicestershire, LE2 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Wren Close, Syston, Leics, LE7 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Wyberton West Road, Boston, Boston, Lincolnshire, PE21 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Yardley Close, Corby, NN17 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Yard (see map) near to 137 Netherton Street, Wishaw, ML2 0EY (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
York Road, Stevenage, Hertfordshire, SG1 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Yorkshire Way, Armthorpe, Doncaster DN3 3GW (1 component)

Behind-the-meter battery storage system at IKEA's Doncaster distribution centre

Inactive • 2021-22 (T-4)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 10 locations