Battery

171 unique locations (1250 components) - Page 5 of 7

Land East of Alders Way, Yalberton Industrial Estate, Paignton, Devon TQ4 7QL (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land at Walworth Farm Bishops Itchington Southam Warwickshire CV47 2SR (2 components)

15 MW Battery Storage facility located at Warwickshire.

Inactive • 2021-22 (T-4)
Land at The Hydro Jennyfield Dr Harrogate HG1 2RP (4 components)

5 MW battery generation system, Harrogate.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land at Sterte Avenue West, Poole, BH15 2AL (20 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-4) ...
11.01 MW
Land at Multitech Kirkhaw Lane Ferrybridge WF11 8RD (4 components)

5 MW battery storage facility

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (12 components)

Battery storage installation to allow for the storage, importation and exportation of energy to the National Grid.

Inactive • 2021-22 (T-4)
Land at Lookabootye Broxburn West Lothian EH52 5PD (10 components)
• New build battery
• Operational battery
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Land at KWTN Solar Limited at JB Wheaton and Sons Limited, Station Road, S Chard TA20 4QN (4 components)

1.14MW Battery Storage Facility

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road South Shields NE34 9PS (5 components)
• New build battery
• Operational battery
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Ineos Wholeflatts Rd Polmont Grangemouth FK3 9UB (5 components)

20MW battery generation system, Grangemouth.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (15 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land at Drumcross Farm, Bishopton nr Erskine PA7 5PR. See map for exact location. (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (12 components)

Battery storage installation to allow for the storage, importation and exportation of energy to the National Grid.

Inactive • 2021-22 (T-4)
Land at Crow Lane, Old Lackenby, Middlesborough, TS6 8DN (2 components)

Lackenby new build distribution-connected lithium-ion battery storage project

Inactive • 2021-22 (T-4)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (10 components)
• 20 MW of DSR
• 20 MW of demand reduction
• 20MW Battery Storage Facility located in Sudbury, Essex.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land at Brook Farm, off Church Hill Road, North of Burstall, IP8 4LA (2 components)

This is a new battery storage plant, based on of lithium ion cells to be installed in multiple ISO compliant battery containers.

Inactive • 2021-22 (T-4)
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (16 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (5 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land Adjoining the A6144 Manchester Road, Carrington M31 4QN (5 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (14 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land adjacent to Northern Power Grid substation Newland Ln Normanton WF6 1QG (4 components)

10 MW Battery Storage facility at Normanton.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land adjacent O A Taylor & Sons Bulbs Limited Washway House Farm Washway Road Holbeach PE12 7PP (2 components)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Land Adjacent Lily Lane Farm Bolton Road Ashton-In-Makerfield,WN4 8TL (5 components)

New build energy storage facility

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations