Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

171 unique locations (1250 components) - Page 7 of 7

Church Farm Solar Farm Slapton Leighton Buzzard Bedfordshire LU7 9BX (3 components)

The CMU consists of a battery energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Carnegie Road, Liverpool, L13 7HY. (6 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (11 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Bristol Road Gloucester GL2 5YA (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
Boundary Street, Wigan WN1 3AP (14 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Borland Ave, Carlisle CA1 2TL (4 components)

2MW BESS

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Boots Store, DD8 3BS (9 components)
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (7 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Birch Holt Farm Burton By Lincoln LN1 2RG (3 components)

The CMU component at Leverton Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 5MW.

Inactive • 2018-19 (T-1)
Bicker Road Donington Spalding PE11 4XR (2 components)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes DN22 8DB (5 components)

Battery storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Bell Farm Loders Bridport DT6 3SA (2 components)

A 5MW Energy storage system located at Bell Farm, Bridport

Inactive • 2021-22 (T-4)
Barnfield Road Swindon SN2 2DJ (3 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Aylesford BES Site Old Church Road Burham Kent ME20 7PA (3 components)

29MW Battery Storage located at Aylesford.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (8 components)
• Battery storage
• Gas fired generating units
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Amersham Road Denham Buckinghamshire SL9 7AW (10 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Ambulance Station Queen Margaret's Road Scarborough YO11 2YH (2 components)

20 MW Storage facility located at Scarborough.

Inactive • 2021-22 (T-4)
Albion Road, Dartford, Kent, DA1 5PZ (13 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Albion Road, Dartford DA1 5PS (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
350 Petre Street Sheffield S4 8LU (16 components)
• New build battery
• New build battery.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
24A Flightway Dunkeswell Honiton EX14 4LG (4 components)

New Build Generating CMU comprising of a battery storage asset

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 21 locations