Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

261 unique locations (935 components) - Page 1 of 11

Yorkshire Way, Armthorpe, Doncaster DN3 3GW (1 component)

Behind-the-meter battery storage system at IKEA's Doncaster distribution centre

Inactive • 2021-22 (T-4)
Yard (see map) near to 137 Netherton Street, Wishaw, ML2 0EY (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (11 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Withyhedge Landfill Site, Rudbaxton, Haverfordwest, Pembrokshire SA62 4DB SM 972 215 (1 component)

Battery Storage at 2.5MWh Capacity

Inactive • 2021-22 (T-4)
Whelley Hill Farm Battery Storage Scheme, Worset Lane, Hart, Hartlepool, TS27 3BH. (1 component)

A 4.8MW Battery Energy Storage System.

Inactive • 2021-22 (T-4)
West Burton Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (4 components)
• West Burton B Power Station CMU 4 [WB4C16] (New build battery storage project)
• West Burton B Power Station CMU 4 [WB4C17] (New build battery storage project)
Inactive • 2020-21 (T-4), 2018-19 (T-1)
Wellington Street, Oldham, OL4 1RL (1 component)

Battery Storage Facility

Battery STOR 108 LTD Not Prequalified OL4
Inactive • 2021-22 (T-4)
Watts Lydney, 16 Mead Lane, Lydney, GL15 5EN (1 component)

The CMU component at Watts Lydney is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Inactive • 2021-22 (T-4)
Waters Meeting Road, Bolton, BL1 8HQ (2 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets
Inactive • 2021-22 (T-4)
Valley Park Inverkip Road Greenock PA16 0AH (2 components)
• 15 MW Storage battery located at Greenock
• 18 MW storage battery located at Greenock
Inactive • 2021-22 (T-4)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (11 components)

10MW battery energy storage facility at Upton Lane, Rownhams

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Unnamed Road Dunblane FK15 9RD (1 component)

9.999 MW Battery Storage unit located at Dunblane.

Inactive • 2021-22 (T-4)
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (3 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit 5, The Bloxwich Lane Estate, Walsall, WS2 8TF (4 components)

Battery Energy Storage System

Inactive • 2021-22 (T-4), 2019-20 (T-1)
Unit 49 The Pensnett Estate, Kingswinford West Midlands DY6 7NA (1 component)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
Unit 3, Wallbridge Industrial Estate, Wallbridge, Stroud, Gloucestershire, GL5 3JU (4 components)

This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 30, New York Way, New York Industrial Park, NE27 0QF (1 component)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
Unit 2, Sentinel House, Enigma Business Park, WR14 1GL (2 components)

Battery Energy Storage System

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit 23B, South Gyle Crescent, Edinburgh, EH12 9EQ (1 component)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
Unit 23 B, South Gyle Crescent, Edinburgh, EH12 9EQ (2 components)

Battery Energy Storage System

Inactive • 2021-22 (T-4)
Unit 1 Junction Lane, Newton-le-Willows, Merseyside, WA12 8DN. (1 component)

The batteries are housed in 1 No ISO container with an additional container used to house converters. The batteries will be installed in the containers on-site and the complete battery …

Battery Shaw-Energi Ltd Not Prequalified WA12
Inactive • 2021-22 (T-4)
Unit 13 Newby Road Industrial Estate Hazel Grove Stockport SK7 5DA (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Battery Less Waste Limited Not Prequalified SK7
Inactive • 2021-22 (T-4)
Unit 10 Ventura Business Park Carterton OX18 1AD (1 component)

A 7MW Energy storage system located at Carterton

Battery BSR Energy Limited Not Prequalified OX18
Inactive • 2021-22 (T-4)
Twibell Street, Barnsley S71 1JE (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations