Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

156 unique locations (1054 components) - Page 1 of 7

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (66 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Yard (see map) near to 137 Netherton Street, Wishaw, ML2 0EY (5 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (9 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
WHITLEY GOLF COURSE CORSHAM ROAD, SHAW, MELKSHAM SN12 8EQ. (Nearest postcode to grid reference: SN12 8EH). (18 components)
• Battery Storage Plant
• Battery storage unit
• Steam Driven Turbo Alternator 8G1 6,8 MWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
West Burton Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (5 components)
• West Burton B Power Station CMU 4 [WB4C16] (New build battery storage project)
• West Burton B Power Station CMU 4 [WB4C17] (New build battery storage project)
Inactive • 2020-21 (T-4), 2018-19 (T-1)
Waters Meeting Road, Bolton, BL1 8HQ (2 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets
Inactive • 2021-22 (T-4)
Valley Park Inverkip Road Greenock PA16 0AH (1 component)

15 MW Storage battery located at Greenock

Inactive • 2021-22 (T-4)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (10 components)
• 10MW battery energy storage facility at Upton Lane, Rownhams
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2024-25 (T-4), 2021-22 (T-4) ...
Unnamed Road Dunblane FK15 9RD (1 component)

9.999 MW Battery Storage unit located at Dunblane.

Inactive • 2021-22 (T-4)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (26 components)
• 25 MW storage site using Lithium Ion Batteries
• Existing 25 MW storage site using Lithium Ion Batteries
• N/A
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.39 MW
Unit 3, Wallbridge Industrial Estate, Wallbridge, Stroud, Gloucestershire, GL5 3JU (4 components)

This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 2, Sentinel House, Enigma Business Park, WR14 1GL (3 components)
• Battery Energy Storage System
• DSR Component providing load turn down at a retail store
Inactive • 2021-22 (T-4)
Unit 10 Ventura Business Park Carterton OX18 1AD (1 component)

A 7MW Energy storage system located at Carterton

Inactive • 2021-22 (T-4)
Twibell Street, Barnsley S71 1JE (3 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
Trow Green Farm, Trow Green, St Brevials, GL15 6QP (4 components)
• New build power station comprised of multiple reciprocating engines.
• The CMU component at Trow Green Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Trent Basin Nottingham NG2 4DS (3 components)
• A 0.5MW Lithium Ion Battery based in Nottingham
• Connah's Quay PS Unit 1 CCGT
Inactive • 2022-23 (T-4), 2018-19 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (8 components)
• 1.200MW Battery Energy Storage System
• A Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
The Street, Hacheston, IP13 9ND (7 components)

battery storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Research Centre, Parc Stormy, Stormydown, Bridgend, CF33 4RS (5 components)
• 4MW BESS
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (4 components)

0.9MW Battery storage located at Hampshire

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Thelwall Lane, Warrington, WA4 1PD (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
The land adjacent to the electricity sub-station off Green Lane Thurcroft S66 9JD (2 components)
• 50 MW Storage facility located at Thurcroft.
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
Inactive • 2022-23 (T-4), 2018-19 (T-1)
The Emirates Stadium, Hornsey Rd, London N7 7AJ (8 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London
• Behind-the-meter battery storage system located at Emirates Stadium in London.
• Generating Unit 2
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (10 components)
• 2MW BESS
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations