Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

4 unique locations (18 components)

Bristol Road Gloucester GL2 5YA (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
8.08 MW
Camilla Farm, Auchtertool, Kircaldy, Fife, KY2 5XW (2 components)
• Battery storage facility with 49.950MW interconnected capacity for both export and import
• Battery storage facility with 49MW interconnected capacity for both export and import
Inactive • 2021-22 (T-4), 2020-21 (T-4)
8.94 MW
Land off Glencryan Road, on Carbrain Industrial Estate, Cumbernauld, G67 2UH (4 components)

The facility consists of a lithium ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN's network at 33kV.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
6.04 MW
Sub Station, Percival Lane, Runcorn, Cheschire WA7 4DS (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
8.08 MW
Loading map...
Showing 4 locations