Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

40 unique locations (97 components) - Page 1 of 2

Valley Park Inverkip Road Greenock PA16 0AH (2 components)
• 15 MW Storage battery located at Greenock
• 18 MW storage battery located at Greenock
Inactive • 2021-22 (T-4)
Unnamed Road Dunblane FK15 9RD (1 component)

9.999 MW Battery Storage unit located at Dunblane.

Inactive • 2021-22 (T-4)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The land adjacent to the electricity sub-station off Green Lane Thurcroft S66 9JD (2 components)

50 MW Storage facility located at Thurcroft.

Battery [PARENT] Limejump Ltd Not Prequalified S66
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (11 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.74 MW
South Kirkby Business Park South Kirkby Pontefract WF9 3SU (1 component)

15 MW Storage facility located at South Kirkby, Pontefract.

Inactive • 2021-22 (T-4)
Rock Farm Ledwych St The Street Ludlow Shropshire SY8 2DS (3 components)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Partridge Hill Farm Austerfield Doncaster DN10 6HA (1 component)

10 MW of Battery Storage located at Doncaster.

Inactive • 2021-22 (T-4)
Orchard Bank Industrial Estate Forfar DD8 1TD (1 component)

9.999 MW battery storage located at Forfar.

Inactive • 2021-22 (T-4)
Newburn Hauge Ind Est Riversdale Way Newcastle NE15 8SF (1 component)

50 MW Storage facility located at Riversdale Way, Newcastle.

Inactive • 2021-22 (T-4)
Netherlands Way Stallingborough Grimsby DN41 8DT (2 components)
• 20 MW Storage facility located at Stallingborough, Grimsby.
• 50 MW Storage facility located at Stallingborough, Grimsby.
Inactive • 2021-22 (T-4)
Needless Hall Farm Toronto Bishop Auckland DL14 7RJ (1 component)

21.6 MW of Battery Storage located in Bishop Auckland.

Inactive • 2021-22 (T-4)
Mucklow Heywood Bridge Halesowen B62 8DL (2 components)
• 12 MW Storage facility located at Mucklow.
• 6 MW Storage facility located at Mucklow, Halesowen.
Inactive • 2021-22 (T-4)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (14 components)
• 7 MW of Battery Storage located at Grantham. (3)
• Battery Storage located at Grantham. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
Land West of Clay Hill Pit Larport farm Larport Lane Dormington Hereford HR1 4EP (1 component)

20 MW Battery Storage facility located at Hereford.

Inactive • 2021-22 (T-4)
Land north of Hinkley Road LE10 3EG (2 components)

5 MW lithium battery located at Hinkley.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land North of Harriots Hayes Lane Albrighton Shropshire WV8 1RQ (1 component)

4.704 MW of Battery Storage located at Shropshire.

Inactive • 2021-22 (T-4)
Land North of Clayhill Farm Westoning MK45 5JD (5 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land North of Bumpers Farm, Bumpers Lane, Ilmer HP27 9RE (1 component)

5 MW of Battery Storage located at Ilmer.

Inactive • 2021-22 (T-4)
Land east of Maldon Hall Farm Maldon Essex CM9 6HD (1 component)

40MW of battery storage located in Essex

Battery [PARENT] Limejump Ltd Not Prequalified CM9
Inactive • 2021-22 (T-4)
Land at Walworth Farm Bishops Itchington Southam Warwickshire CV47 2SR (1 component)

15 MW Battery Storage facility located at Warwickshire.

Inactive • 2021-22 (T-4)
Land at Manor Farm Wainfleet Road Irby in the Marsh Skegness Lincolnshire PE24 5AY (1 component)

9.408 MW of Battery Storage at Land at Manor Farm, Lincolnshire.

Inactive • 2021-22 (T-4)
Kirkthorpe Weir Kirkthorpe Wakefield West Yorkshire WF1 5SY (3 components)

The CMU component at Kirkthorpe is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Kilshaw Street Wigan Greater Manchester WN5 8EA (1 component)

20 MW battery storage located at Wigan.

Battery [PARENT] Limejump Ltd Not Prequalified WN5
Inactive • 2021-22 (T-4)
J3 Business Park Balby Carr End Doncaster DN4 8DE (4 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 25 locations