Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (66 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
WHITLEY GOLF COURSE CORSHAM ROAD, SHAW, MELKSHAM SN12 8EQ. (Nearest postcode to grid reference: SN12 8EH). (18 components)
• Battery Storage Plant
• Battery storage unit
• Steam Driven Turbo Alternator 8G1 6,8 MWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Trow Green Farm, Trow Green, St Brevials, GL15 6QP (4 components)
• New build power station comprised of multiple reciprocating engines.
• The CMU component at Trow Green Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Trent Basin Nottingham NG2 4DS (3 components)
• A 0.5MW Lithium Ion Battery based in Nottingham
• Connah's Quay PS Unit 1 CCGT
Inactive • 2022-23 (T-4), 2018-19 (T-1)
The land adjacent to the electricity sub-station off Green Lane Thurcroft S66 9JD (2 components)
• 50 MW Storage facility located at Thurcroft.
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
Inactive • 2022-23 (T-4), 2018-19 (T-1)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (10 components)
• 2MW BESS
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Salford Lodge Pitchill Evesham WR11 8SN (3 components)
• 0.1MW Tesla battery located at Eversham
• Connah's Quay PS Unit 1 CCGT
Inactive • 2022-23 (T-4), 2018-19 (T-1)
Plot B at Severn Road Avonmouth BS10 7SE (11 components)
• Existing Generator Battery Energy Storage System
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• New Build Battery Energy Storage Systems
Active • 2025-26 (T-4), 2025-26 (T-1) ...
5.25 MW
Middle Balbeggie Solar Farm, Kirkcaldy, Fife, KY1 3NW (5 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU consists of an energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the west (see map) of 18-20 Netherdale Rd, Netherton Industrial Estate, Wishaw ML2 0ER (9 components)
• A new build 30MW battery energy storage system
• Load reduction on site supported by non-exporting standby generation.
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land to the south of the A883 near Bonnybridge FK4 1SN (5 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (12 components)
• Killingholme Module 2 converted to open cycle operation
• Load reduction
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
LAND ON THE SOUTH SIDE OF, PURLIEUS FARM, MINETY, MALMESBURY, SN16 9RP (Nearest postcode SN16 9DX) (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery Storage Plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (4 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land East of Alders Way, Yalberton Industrial Estate, Paignton, Devon TQ4 7QL (5 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land at Sterte Avenue West, Poole, BH15 2AL (17 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-4) ...
9.24 MW
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 2026 kW CHP unit
• N/A
Active • 2025-26 (T-4), 2022-23 (T-4) ...
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (16 components)
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (7 components)
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• Manufacturing site providing demand response
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (17 components)
• Component has yet to be procured.
• Gas peaking reciprocating engines
• Generating Unit 1
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
204.51 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (15 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.05 MW
Carnegie Road, Liverpool, L13 7HY. (5 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...