Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

25 unique locations (284 components)

Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (10 components)
• Battery storage
• Gas fired generating units
• To be confirmed once CMU components are known
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (15 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.05 MW
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (5 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 1.5MW together with transformers, switchgear and associated control gear
• A Battery Energy Storage System
• Ratcliffe Unit 1 coal-fired unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (16 components)
• Gas fuelled generation plant
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Drumcross Farm, Bishopton nr Erskine PA7 5PR. See map for exact location. (5 components)
• Gas reciprocating engines
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Land at KWTN Solar Limited at JB Wheaton and Sons Limited, Station Road, S Chard TA20 4QN (3 components)
• 1.14MW Battery Storage Facility
• The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity of 4000 kVA.
Inactive • 2022-23 (T-3), 2018-19 (T-1)
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 2026 kW CHP unit
• N/A
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Land at Sterte Avenue West, Poole, BH15 2AL (17 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-4) ...
9.24 MW
Land off Carseview Road, Forfar, DD8 3BS (5 components)
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (5 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
6.38 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (12 components)
• Killingholme Module 2 converted to open cycle operation
• Load reduction
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Land to the south west of Stony Stratford Substation Stratford Road Milton Keynes MK19 6DZ (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• New build battery
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Land to the west (see map) of 18-20 Netherdale Rd, Netherton Industrial Estate, Wishaw ML2 0ER (9 components)
• A new build 30MW battery energy storage system
• Load reduction on site supported by non-exporting standby generation.
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Longcliffe Quarry, B5056, Matlock, Derbyshire DE4 4HN, UK (15 components)
• Battery Storage facility
• gas reciprocating engines.
• gas-fired CHP unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (8 components)
• 14.710 MW CHP generation
• A Battery Energy Storage System.
• The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1.07 MW
Philip Dennis Foodservice Mullacott Cross Industrial Estate Ilfracombe Devon EX34 8PL (7 components)
• 0.261 MW of DSR
• N/A
• Water treatment centre
Inactive • 2022-23 (T-3), 2020-21 (T-1) ...
Philip Dennis Foodservice Roundswell Business Park Barnstaple Devon EX31 3TD (5 components)
• 3.75 MW storage battery located in Devon
• 3.750 MW of demand reduction
• Water treatment centre
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (10 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• Gas reciprocating engines.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
34.08 MW
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Inactive • 2022-23 (T-3), 2022-23 (T-1) ...
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (5 components)
• Aux. load separately metered
• Storage facility
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
The Emirates Stadium, Hornsey Rd, London N7 7AJ (8 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London
• Behind-the-meter battery storage system located at Emirates Stadium in London.
• Generating Unit 2
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (8 components)
• 1.200MW Battery Energy Storage System
• A Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Trow Green Farm, Trow Green, St Brevials, GL15 6QP (4 components)
• New build power station comprised of multiple reciprocating engines.
• The CMU component at Trow Green Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
WHITLEY GOLF COURSE CORSHAM ROAD, SHAW, MELKSHAM SN12 8EQ. (Nearest postcode to grid reference: SN12 8EH). (18 components)
• Battery Storage Plant
• Battery storage unit
• Steam Driven Turbo Alternator 8G1 6,8 MWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (66 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 25 locations