Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

12 unique locations (74 components)

Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (12 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
55.36 MW
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. …

Inactive • 2022-23 (T-4), 2021-22 (T-4)
4.73 MW
Q Park, Bath Road, Inchbrook, Stroud, GL5 5HT (3 components)

This CMU is formed of two battery banks and PCS that when combined are capable of providing in excess of 2MW of power. The system is connected via switch gear …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.82 MW
Land to the west (see map) of 18-20 Netherdale Rd, Netherton Industrial Estate, Wishaw ML2 0ER (6 components)
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
12.87 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (9 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
18.81 MW
Land North of Clayhill Farm Westoning MK45 5JD (5 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
Inactive • 2021-22 (T-4), 2018-19 (T-1)
7.61 MW
Land in the vicinity of Feeder Road, to the east of Phillip Street, Bristol BS2 0TH, UK (1 component)

The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Battery FLEXITRICITY LIMITED Not Prequalified BS2
Inactive • 2021-22 (T-4)
3.15 MW
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (11 components)

Battery storage installation to allow for the storage, importation and exportation of energy to the National Grid.

Inactive • 2021-22 (T-4)
8.86 MW
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (9 components)
• Battery Storage Plant
• Battery storage plant
• Gas Peaking Reciprocating Engine
Active • 2024-25 (T-4), 2023-24 (T-4) ...
191.97 MW
Former RAF Coltishall Scottow Enterprise Park NR10 5FB (1 component)

2.2MW battery storage located at Coltishall.

Inactive • 2021-22 (T-4)
0.80 MW
Commercial Road, Wolverhampton, WV1 3RD (4 components)

battery storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
2.02 MW
Loading map...
Showing 12 locations