Battery

20 unique locations (353 components)

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (52 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
43.67 MW
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (12 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
55.36 MW
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (13 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.67 MW
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. …

Inactive • 2022-23 (T-4), 2021-22 (T-4)
4.73 MW
Q Park, Bath Road, Inchbrook, Stroud, GL5 5HT (3 components)

This CMU is formed of two battery banks and PCS that when combined are capable of providing in excess of 2MW of power. The system is connected via switch gear …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.82 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (14 components)
• 7 MW of Battery Storage located at Grantham. (3)
• Battery Storage located at Grantham. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.83 MW
Land to the west (see map) of 18-20 Netherdale Rd, Netherton Industrial Estate, Wishaw ML2 0ER (6 components)
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
12.87 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (9 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
18.81 MW
Land North of Clayhill Farm Westoning MK45 5JD (5 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
Inactive • 2021-22 (T-4), 2018-19 (T-1)
7.61 MW
Land in the vicinity of Feeder Road, to the east of Phillip Street, Bristol BS2 0TH, UK (1 component)

The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Battery FLEXITRICITY LIMITED Not Prequalified BS2
Inactive • 2021-22 (T-4)
3.15 MW
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (11 components)

Battery storage installation to allow for the storage, importation and exportation of energy to the National Grid.

Inactive • 2021-22 (T-4)
8.86 MW
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (9 components)
• Battery Storage Plant
• Battery storage plant
• Gas Peaking Reciprocating Engine
Active • 2024-25 (T-4), 2023-24 (T-4) ...
191.97 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (16 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
Active • 2026-27 (T-4), 2025-26 (T-4) ...
74.59 MW
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (16 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
35.97 MW
Former RAF Coltishall Scottow Enterprise Park NR10 5FB (1 component)

2.2MW battery storage located at Coltishall.

Inactive • 2021-22 (T-4)
0.80 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (61 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11746.14 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (92 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage).
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2324.15 MW
Commercial Road, Wolverhampton, WV1 3RD (4 components)

battery storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
2.02 MW
Loading map...
Showing 20 locations