Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (52 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (11 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Unit 5, The Bloxwich Lane Estate, Walsall, WS2 8TF (4 components)

Battery Energy Storage System

Inactive • 2021-22 (T-4), 2019-20 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (9 components)

2MW BESS

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (7 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (13 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (13 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
1.86 MW
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)
• 3 MW of DSR
• 3 MW of demand reduction
• 3MW Battery Storage facility located at Scarborough
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (5 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (7 components)

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Port of Tilbury, Tilbury, RM18 7EH (3 components)
• New Build Generation CMU, advanced battery energy storage system.
• Site demand offset by onsite behind the meter advanced battery energy storage system.
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Philip Dennis Foodservice Roundswell Business Park Barnstaple Devon EX31 3TD (5 components)
• 3.75 MW storage battery located in Devon
• 3.750 MW of demand reduction
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Philip Dennis Foodservice Mullacott Cross Industrial Estate Ilfracombe Devon EX34 8PL (7 components)
• 0.261 MW of DSR
• 0.261 MW of demand reduction
• 0.261MW Storage Battery located in Devon
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (19 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
2.60 MW
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (8 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network …

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (7 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export capacity of 40MW.
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Milton Court Farm, Dorking, RH4 3LY (13 components)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
• 6MW battery energy storage facility at Milton Court Farm, Dorking
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (5 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (5 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (13 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 years of operation.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.96 MW
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (7 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...