Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

44 unique locations (491 components) - Page 1 of 2

Albion Road, Dartford, Kent, DA1 5PZ (13 components)

battery storage (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
5.63 MW
Amersham Road Denham Buckinghamshire SL9 7AW (7 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.85 MW
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (7 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
13.51 MW
Boundary Street, Wigan WN1 3AP (14 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
23.01 MW
Breck Road, Wallasey, Liverpool (4 components)

The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation.

Inactive • 2021-22 (T-4), 2019-20 (T-1)
1.41 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (9 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1.61 MW
Carnegie Road, Liverpool, L13 7HY. (5 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.08 MW
Cleveland Potash ICL UK Boulby Mine Loftus Saltburn TS13 4UZ (4 components)

6MW BESS

Inactive • 2019-20 (T-1), 2018-19 (T-1)
4.44 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (61 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11746.14 MW
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (55 components)
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• BM Unit T_FFES-2 at Ffestiniog Power Station (Pumped Storage).
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
691.70 MW
1.83 MW
J3 Business Park Balby Carr End Doncaster DN4 8DE (4 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
7.46 MW
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (14 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
34.18 MW
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (4 components)
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
16.53 MW
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (8 components)
• 20 MW of DSR
• 20 MW of demand reduction
• 20MW Battery Storage Facility located in Sudbury, Essex.
• ... and 1 more unique description
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
43.05 MW
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (9 components)
• Battery Storage Plant
• Battery storage plant
• Gas Peaking Reciprocating Engine
Active • 2024-25 (T-4), 2023-24 (T-4) ...
191.97 MW
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (13 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
56.17 MW
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road South Shields NE34 9PS (3 components)
• New build battery
• Operational battery
Inactive • 2019-20 (T-1), 2018-19 (T-1)
13.59 MW
Land at Lookabootye Broxburn West Lothian EH52 5PD (7 components)
• New build battery
• Operational battery
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
7.77 MW
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (7 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
45.55 MW
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (13 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 years of operation.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
54.75 MW
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (5 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.63 MW
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (5 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
2.89 MW
Loading map...
Showing 25 locations