Battery

121 unique locations (723 components) - Page 1 of 5

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (52 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Yard (see map) near to 137 Netherton Street, Wishaw, ML2 0EY (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (11 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
West Burton Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (4 components)
• West Burton B Power Station CMU 4 [WB4C16] (New build battery storage project)
• West Burton B Power Station CMU 4 [WB4C17] (New build battery storage project)
Inactive • 2020-21 (T-4), 2018-19 (T-1)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (11 components)

10MW battery energy storage facility at Upton Lane, Rownhams

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Unit 3, Wallbridge Industrial Estate, Wallbridge, Stroud, Gloucestershire, GL5 3JU (4 components)

This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Twibell Street, Barnsley S71 1JE (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Trent Basin Nottingham NG2 4DS (3 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Street, Hacheston, IP13 9ND (7 components)

battery storage

Battery Storage HC ESS3 LIMITED Not Prequalified IP13
Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Research Centre, Parc Stormy, Stormydown, Bridgend, CF33 4RS (4 components)

4MW BESS

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (4 components)

0.9MW Battery storage located at Hampshire

Battery Storage LIMEJUMP LTD Not Prequalified SO51
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Thelwall Lane, Warrington, WA4 1PD (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
The land adjacent to the electricity sub-station off Green Lane Thurcroft S66 9JD (2 components)

50 MW Storage facility located at Thurcroft.

Battery [PARENT] Limejump Ltd Not Prequalified S66
Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Emirates Stadium, Hornsey Rd, London N7 7AJ (8 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London
• Behind-the-meter battery storage system located at Emirates Stadium in London.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (9 components)

2MW BESS

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (7 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Sub Station, Percival Lane, Runcorn, Cheschire WA7 4DS (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
Stone Pit 1, Cotton Lane, Dartford, Kent DA9 9BB (5 components)
• Storage equipment to be installed. The storage asset will be built in an existing building.
• The site will consist of a number of reciprocating machines - it is currently envisaged that these will be diesel.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (13 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (13 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
1.86 MW
Severn Way, Berkeley GL13 9TN (3 components)

This CMU is formed of a battery bank and PCS capable of providing 30MW of power. The system is connected via switch gear and a transformer to the distribution network …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)
• 3 MW of DSR
• 3 MW of demand reduction
• 3MW Battery Storage facility located at Scarborough
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Salford Lodge Pitchill Evesham WR11 8SN (3 components)

0.1MW Tesla battery located at Eversham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (5 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 25 locations