84 unique locations (352 components) - Page 1 of 4

24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
• New Build Generating CMU comprising of a battery storage asset (2)
• New Build CMU comprising of battery storage and associated plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
adjacent to Kilmarnock South Substation KA1 3TN (12 components)

Lithium ion battery storage plant (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
150.05 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Adjacent to National Grid Stalybridge substation SK15 3DA. (1 component)

Lithium ion battery storage plant.

Active • 2027-28 (T-4)
15.39 MW
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
122.81 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (5 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.23 MW
Coal Aston, Dronfield, S18 3AA (2 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
28.21 MW
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.68 MW
Dounreay, Thurso KW14 7RE (2 components)
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
21.31 MW
Dragons Lane, Moston, Sandbach, CW11 3QH (2 components)

12 MW Connection 48 MWh Distribution unit (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
5.50 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.82 MW
Eccles Birgham Farm, TD12 4LU (2 components)
• Lithium ion battery storage plant
• Lithium ion battery storage plant.
Active • 2027-28 (T-4)
30.78 MW
Eccles Birgham Farm, TD12 4LU. (1 component)

Lithium ion battery storage plant.

Active • 2027-28 (T-4)
15.39 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
16.70 MW
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2025-26 (T-1), 2024-25 (T-1)
2.58 MW
Heysham Road, Bootle, L30 6TU (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom (1 component)

BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …

Active • 2028-29 (T-4)
7.93 MW