Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT

866 unique locations (4451 components) - Page 1 of 35

1020 CENTRE PARK, WARRINGTON WA1 1QL (1 component)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.

OCGT WARRINGTON POWER LIMITED Not Prequalified WA1
Inactive • 2020-21 (T-4)
1020 CENTRE PARK, WARRINGTON WA1 1QY (2 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
112 Beddington Lane, Beddington CR0 4TB (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 ORF (2 components)

Combined Cycle Gas Turbine (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
2236 London Road, Glasgow, G32 8YF (2 components)

New build power station comprised of multiple reciprocating engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (5 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
• Gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
2 Parsonage Lane, Rochester, Kent, ME2 4UR (1 component)

New Gas-fired 20MW CMU connected on the distrbution network boundary via a standard COP2 meter with no auxilliary load on site

Inactive • 2021-22 (T-4)
2 Salterns Lane, Burlesdon, Southampton, SO31 8DH (3 components)

38 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 38*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions … (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (33 components)
• Operational gas reciprocating engine. (2)
• Operational Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
33 Oxford Road Yeovil BA21 5HR (6 components)
• New build battery (2)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2021-22 (T-4), 2020-21 (T-4)
40 Burrowfields, Welwyn Garden City, Hertfordshire, AL7 4SR (2 components)

6 MW power plant comprising a series of gas reciprocating engines (2)

OCGT AGR Peak Power LTD Not Prequalified AL7
Inactive • 2020-21 (T-4), 2017-18 (T-1)
45-47 Somers Road Rugby CV22 7DH (3 components)

New build gas generator (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
4 Finway Road Hemel Hempstead HP2 7PT (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
501 Merlin Park, Burscough Industrial Estate, Ormskirk, L40 8JY (4 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
525 Brenda Rd, Hartlepool TS25 1HT (4 components)

Gas fired reciprocating engines. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
58 Appley Lane N, Appley Bridge, Wigan WN6 9AQ. (1 component)

A new build 5MW gas fuelled generating station.

Inactive • 2021-22 (T-4)
5 Mile Drive, Northwick, GL56 9TR (5 components)

Reciprocating engines (3)

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
6 Kiln, Kilms Business Park LE10 3EQ (2 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the WPD distribution network and local gas network. (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
88 Coventry Road Broughton Astley Leicester LE9 6QA (6 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
975 Mollison Avenue EN3 7NN (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
Loading map...
Showing 25 locations