Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "WS9"

8 unique locations (41 components)

Sort by: Relevance A-Z Components MW Date
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Active • 2028-29 (T-4), 2026-27 (T-4)
8.79 MW
(Estimated)
Middlemore Lane, Aldridge, Walsall WS9 8ZD (4 components)

Diesel and/or gas reciprocating engines.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(De-rated)
Middlemore Lane, Aldridge, WS9 8DL (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

UK Energy Reserve Limited Not Prequalified WS9
Inactive • 2020-21 (T-4)
No capacity data
(De-rated)
QUICKSAND LANE ALDRIDGE WALSALL WEST MIDLANDS WS9 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
0.02 MW
(Estimated)
Tintagel Way, Walsall WS9 8EW (5 components)

Diesel and/or gas reciprocating engines.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(De-rated)
Westgate One, Westgate, Aldridge, Walsall, WS9 8EX (5 components)

Diesel and/or gas reciprocating engines.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(De-rated)
Widney Avenue, Walsall, WS9 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
(Estimated)
WS9 (22 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
12.71 MW
(Estimated)
Loading map...
Showing 8 locations