Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "WN5"

12 unique locations (103 components)

Asda Wigan, Soho Street Robin Park WN5 0XA (8 components)
• Load curtailment from refridgeration
• Load drop
DSR Part of RESERVE POWER HOLDINGS (JERSEY) LIMITED FLEXITRICITY LIMITED WN5
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.43 MW
(Estimated)
EDINBURGH DRIVE WIGAN LANCASHIRE WN5 (3 components)

EV charging at residential premises

DSR EV Charging Part of Octopus Energy Group Limited OCTOPUS ENERGY LIMITED WN5
Inactive • 2023-24 (T-1)
0.0042 MW
(Estimated)
Kilshaw Street Wigan Greater Manchester WN5 8EA (1 component)

20 MW battery storage located at Wigan.

Battery Part of Limejump Ltd Limejump Virtual 4 Limited Not Prequalified WN5
Inactive • 2021-22 (T-4)
No capacity data
(De-rated)
Land North East Of Sandyforth Farm Ashton Road Billinge Wigan WN5 7XZ (2 components)

New Build Battery Storage

Storage (Duration 2h) Part of Econergy International Limited UKGEA 1 LIMITED Not Prequalified WN5
Active • 2028-29 (T-4)
12.14 MW
(Estimated)
Land North East of Sandyforth Farm, Ashton Road, Wigan WN5 7XZ (2 components)

New Build Battery Storage

Storage (Duration 2h) Part of Econergy International Limited UKGEA 1 LIMITED Not Prequalified WN5
Active • 2028-29 (T-4)
14.51 MW
(Estimated)
Lawns Avenue, Wigan, WN5 8UH (4 components)

A gas fuelled generating station.

Reciprocating engines Part of Avery Energy Limited AVE 014 Limited Not Prequalified WN5
Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.65 MW
(Estimated)
NABURN DRIVE ORRELL WIGAN LANCASHIRE WN5 (23 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
11.04 MW
(Estimated)
SMETHURST ROAD BILLINGE WN5 (1 component)

EV charging at residential premises

EV Charging Part of Octopus Energy Group Limited OCTOPUS ENERGY LIMITED Rejected WN5
Active • 2026-27 (T-4)
0.0097 MW
(Estimated)
TARNSIDE ROAD ORRELL WIGAN LANCASHIRE WN5 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
11.04 MW
(Estimated)
TONTINE ORRELL WIGAN LANCASHIRE WN5 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
11.04 MW
(Estimated)
WN5 (33 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
DSR EV Charging Part of Octopus Energy Group Limited AXLE ENERGY LIMITED WN5
Active • 2025-26 (T-4), 2025-26 (T-1) ...
51.80 MW
(Estimated)
Loading map...
Showing 11 locations