Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "WESTON ROAD LICHFIELD STAFFORDSHIRE WS13"

1 unique locations (12 components)

WESTON ROAD LICHFIELD STAFFORDSHIRE WS13 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
(Estimated)
125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (3 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on-site and standby generation
Inactive • 2022-23 (T-1), 2020-21 (T-4) ...
No capacity data
(Estimated)
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (34 components)
• DSR components to be assigned prior to the start of the Delivery Year.
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
21.21 MW (Est from CMU) (part of 21.21 MW aggregated CMU)
(Estimated)
Elevator Road, Trafford Park M17 1BR (2 components)
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elavator Road
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elevator Road
Inactive • 2022-23 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (14 components)
• Combined Cycle Gas Turbine
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.26 MW (Est from CMU) (part of 16.26 MW aggregated CMU)
(Estimated)
Land at Manton Wood, Retford Road, Worksop, Notts, S80 2PU (3 components)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
19.00 MW (Est from CMU) (part of 19.00 MW aggregated CMU)
(Estimated)
No capacity data
(Estimated)
Land west of Cheston Road, Birmingham, B7 5EU (2 components)

3 x 2MW gas fuelled generator units to be installed on a compound on industrial land west of Cheston Road.

Inactive • 2023-24 (T-4)
5.70 MW (Est from CMU) (part of 5.70 MW aggregated CMU)
(Estimated)
Mannington Depot, Telford Way, Swindon, Wiltshire, SN5 8WA (2 components)
• 14 x 1.1MW gas reciprocating engines at Canal St, Brierley Hill, Dudley on a designated in an industrial / Commercial district.
• Inverter driven lithium-ion battery.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
No capacity data
(Estimated)
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (11 components)
• Mercia Waste Management Ltd Hartlebury Trading Estate Kidderminster DY10 4JB. In build Energy from Waste plant in Hartlebury. Auxilliary load is not included in connection capacity .i.e the export is net.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
69.27 MW (Est from CMU) (part of 69.27 MW aggregated CMU)
(Estimated)
Sheepbridge Industrial Estate Foxwood Road, Chesterfield, North East Derbyshire, S41 9RX (1 component)

New reciprocating genset in acoustic enclosure.

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
Sheepbridge Industrial Estate Foxwood Road, Chesterfield, North East Derbyshire, S41 9RX (2 components)

New reciprocating genset in acoustic enclosure.

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
Weighbridge Road, Shotton, Deeside, CH5 2LL (20 components)
• A gas fuelled generating station.
• Paper mill industrial site
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
48.00 MW (Est from CMU) (part of 48.00 MW aggregated CMU)
(Estimated)
Westfield Road, Carlton, Wakefield, WF3 3RJ (2 components)

Battery energy storage system

Active • 2028-29 (T-4)
20.90 MW
(Estimated)
Loading map...
Showing 16 locations