Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "TS21 1EA"

2 unique locations (6 components)

Sort by: Relevance A-Z Components MW Date
Carlton, Stockton-on-Tees, TS21 1EA (5 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 …

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU TS21
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.27 MW (CMU ANC1B2)
(Mixed)
Land South East of the Carrs Fishing Lakes, Letch Lane, Carlton, Stockton-on-Tees, TS21 1EA (1 component)

CMU is a 57MW/114MWh Battery Electric Storage System, which will connect to the Transmission network via a tertiary winding at the Norton 275kV substation. The Facility will comprise of 32 …

Active • 2027-28 (T-4)
5.76 MW (CMU MFM001)
(Estimated)
Loading map...
<\!-- Shared Category Filter JavaScript -->