Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "TN25 6AF"

3 unique locations (16 components)

Land west of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h) Part of Pivot Power (Holding) Limited PIVOTED POWER LLP Not Prequalified TN25
Active • 2027-28 (T-4)
5.68 MW
(Estimated)
Sellindge Convertor Station, Church Lane, Sellindge, Ashford, TN25 6AF (14 components)
• Interconnexion France Angleterre (IFA) 2,000MW high voltage direct current link between the French and GB transmission systems.
• Interconnexion France Angleterre (IFA) 1988MW (TEC) high voltage direct current link between the French and GB transmission systems.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
234.58 MW
(Estimated)
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) Part of Pivot Power (Holding) Limited PIVOTED POWER LLP Not Prequalified TN25
Active • 2026-27 (T-4)
8.03 MW
(Estimated)
Loading map...
Showing 3 locations