Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "SS6 9RN"

2 unique locations (10 components)

Asda Rawreth Lane SS6 9RN (2 components)

Load drop

Inactive • 2023-24 (T-1), 2022-23 (T-1)
No capacity data
(Estimated)
Asda Rayleigh, Rawreth Lane SS6 9RN (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
31.92 MW (Est from CMU) (part of 31.92 MW aggregated CMU)
(Estimated)
EDF Energy, Heysham 2 power station, Morecambe, Lancashire, LA3 2XH (43 components)
• Heysham 2 Power Station CMU 7: [HY2723] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 7: [HY2724] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 8: [HY2824] T_HEYM28 + (50% x T_HEYM2-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3985.39 MW (Est from CMU) (part of 3985.39 MW aggregated CMU)
(Estimated)
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2527.80 MW (Est from CMU) (part of 2527.80 MW aggregated CMU)
(Estimated)
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (10 components)
• A 50MW New Build Battery Storage site
• CMU Component is 500kVA reciprocating diesel engine.
• Existing 50MW Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
No capacity data
(Estimated)
Loading map...
Showing 5 locations