Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "SP4"

2 unique locations (12 components)

Church Bottom, Salisbury, SP4 6NN (3 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
Storage (Duration 1h) Part of Arlington Energy Limited ARL 008 Limited Conditional SP4
Inactive • 2022-23 (T-4)
No capacity data
(De-rated)
SP4 7BE (9 components)

Water treatment centre

DSR Part of General Electricity Holdings KIWI POWER LTD SP4
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(De-rated)
Loading map...
Showing 2 locations