Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "SK17 7JB"

6 unique locations (13 components) - Page 1 of 2

Sort by: Relevance A-Z Components MW Date
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Active • 2025-26 (T-1)
3.73 MW (CMU Bux003)
(Estimated)
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU SK17
Active • 2024-25 (T-1)
3.46 MW (CMU Bux002)
(Estimated)
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton

Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU SK17
Active • 2025-26 (T-1), 2024-25 (T-1)
3.31 MW (CMU Wat003)
(Estimated)
Waterswallows Road Buxton Derbyshire SK17 7JB (7 components)

2.115MW Diesel and/or dual fuel reciprocating engine

Inactive • 2018-19 (T-1)
13.20 MW (CMU water2) (Historical)
(Estimated)
Waterswallows Road, Buxton, Derbyshire, SK17 7JB (1 component)

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines STOR 119 Ltd New Build Generating CMU Not Prequalified SK17
Inactive • 2021-22 (T-4)
18.96 MW (CMU SPOW19) (Historical)
(Estimated)
Loading map...
<\!-- Shared Category Filter JavaScript -->