SIDS FIELD CASTLE CARROCK BRAMPTON CA8 (12 components)

EV charging at residential premises

DSR EV Charging Part of Pennnat Walters (Holdings) Limited ENERSYST LIMITED CA8
Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.43 MW
(Estimated)
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
• CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 20kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 28 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 7 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/20kV step up transformer and a 630A 20 kV Ring Main Unit (RMU);
• CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered, and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 16 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 8 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU);
Active • 2027-28 (T-4), 2026-27 (T-4)
3.46 MW
(Estimated)
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (4 components)

electricity storage site comprising brand new batteries, inverters and associated connection plant

Active • 2026-27 (T-4), 2025-26 (T-4)
11.94 MW
(Estimated)
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (4 components)

A new battery storage plant, with associated civil works, switchgear and electrical connection.

Storage (Duration 1h) Part of Lyford Power Limited Field Gerrards Cross Ltd Not Prequalified SL9
Active • 2024-25 (T-4), 2021-22 (T-1)
14.00 MW
(Estimated)
Westfield Energy Recovery Limited, Lochgelly, Fife. (3 components)

Energy Recovery Facility burning waste

Active • 2025-26 (T-4), 2024-25 (T-4) ...
20.41 MW
(Estimated)