Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "SA5"

16 unique locations (51 components)

Abergelli Power Station, Felindre, Swansea, SA5 7NN (5 components)
• A new Open Cycle Gas Turbine (OCGT) peaking power plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Open Cycle Gas Turbine (OCGT) Part of Drax Smart Generation HoldCo Limited ABERGELLI POWER LIMITED SA5
Active • 2026-27 (T-4), 2025-26 (T-4) ...
285.45 MW (Est from CMU)
(Estimated)
Broughton Avenue, Portmead, Swansea, West Glamorgan, SA5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
(Estimated)
Felindre Pumping Station Substation, Pant Lasau Road, Llangyfelach, Morriston, SA5 7PA (1 component)

16MW/32MWh BESS on a future Greener Grid Park.

Storage (Duration 2h) Part of Statkraft AS STATKRAFT UK LTD Rejected SA5
Active • 2025-26 (T-4)
4.77 MW
(Estimated)
Generation Compound Land Off Titanium Road, Swansea, SA5 4SG (2 components)

A new build gas fuelled generation plant with ancilliary equipment.

Reciprocating engines Part of Fpc Income & Growth Plc ELECTRIC LAND & POWER LIMITED Not Prequalified SA5
Active • 2028-29 (T-4)
18.70 MW
(Estimated)
Green Frog Power 214 STOR Generation off Roseland Rd, West Glamorgan, Swansea, SA5 4SG (1 component)

Gas fired reciprocating engines.

Reciprocating engines Part of GFPII Limited Dockside Power Limited Conditional SA5
Inactive • 2022-23 (T-4)
No capacity data
(De-rated)
Green Frog Power 214 STOR Generation off Roseland Road, off Titanium Road, West Glamorgan, Swansea, SA5 4SG (1 component)

Gas fired reciprocating engines.

Reciprocating engines Part of Pulse Clean Energy Limited PULSE CLEAN ENERGY UK LIMITED Not Prequalified SA5
Active • 2024-25 (T-4)
19.04 MW
(Estimated)
Heol Myddfai Felindre SWANSEA SA5 (1 component)

EV charging at residential premises

EV Charging Part of Octopus Energy Group Limited OCTOPUS ENERGY LIMITED Rejected SA5
Active • 2027-28 (T-4)
0.02 MW
(Estimated)
Monterey Street, Manselton, Abertawe, SA5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
(Estimated)
SA5 (6 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR EV Charging Part of Octopus Energy Group Limited LEVELISE LIMITED SA5
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.23 MW
(Estimated)
Titanium Rd, Swansea, SA5 4SF (8 components)

Reciprocating engines

Part of GFPII Limited Dockside Power Limited SA5
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
9.45 MW
(Estimated)
Titanium Road, Cocket, Swansea, SA5 4NH (7 components)
• New build site with gas reciprocating engines to replace diesel plant
• STOR diesel engines that will operate environmentally with mixed fuel
Reciprocating engines Part of GFP (Holdings) Limited GFI73 LTD SA5
Active • 2026-27 (T-4), 2025-26 (T-4) ...
18.96 MW
(Estimated)
Titanium Road, Swansea SA5 4SG (2 components)

New build CMU employing reciprocating engines running on natural gas.The Financial Commitment Milestone has been achieved for a previous auction. The site will generate at unity and therefore a power …

Part of GFPII Limited Dockside Power Limited SA5
Inactive • 2017-18 (T-1)
No capacity data
(De-rated)
Titanium Road, Swansea, SA5 4SG (2 components)

Gas fired reciprocating engines.

Reciprocating engines Part of GFPII Limited Dockside Power Limited Not Prequalified SA5
Inactive • 2023-24 (T-4), 2022-23 (T-3)
19.00 MW
(Estimated)
Titanium Road, Waunarlwydd, Swansea, SA5 4NH (3 components)
• New build site with gas reciprocating engines to replace diesel plant
• New gas reciprocating engines to be installed and/or existing plant to be refurbished/replaced to operate on green bio-fuel.
Active • 2028-29 (T-4), 2027-28 (T-4)
18.87 MW
(Estimated)
Titanium Road, Waunarlwydd, Swansea, SA5 4SG (9 components)
• Gas fired reciprocating engines
• Gas fired reciprocating engines.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
No capacity data
(De-rated)
Loading map...
Showing 16 locations