Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "SA5"

16 unique locations (51 components)

Sort by: Relevance A-Z Components MW Date
Abergelli Power Station, Felindre, Swansea, SA5 7NN (5 components)
• A new Open Cycle Gas Turbine (OCGT) peaking power plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
285.45 MW (Est from CMU)
(Estimated)
Broughton Avenue, Portmead, Swansea, West Glamorgan, SA5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
(Estimated)
Felindre Pumping Station Substation, Pant Lasau Road, Llangyfelach, Morriston, SA5 7PA (1 component)

16MW/32MWh BESS on a future Greener Grid Park.

Active • 2025-26 (T-4)
4.77 MW
(Estimated)
Generation Compound Land Off Titanium Road, Swansea, SA5 4SG (2 components)

A new build gas fuelled generation plant with ancilliary equipment.

Active • 2028-29 (T-4)
18.70 MW
(Estimated)
No capacity data
(De-rated)
Heol Myddfai Felindre SWANSEA SA5 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
0.02 MW
(Estimated)
Monterey Street, Manselton, Abertawe, SA5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
(Estimated)
SA5 (6 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.23 MW
(Estimated)
Titanium Rd, Swansea, SA5 4SF (8 components)

Reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
9.45 MW
(Estimated)
Titanium Road, Cocket, Swansea, SA5 4NH (7 components)
• New build site with gas reciprocating engines to replace diesel plant
• STOR diesel engines that will operate environmentally with mixed fuel
Active • 2026-27 (T-4), 2025-26 (T-4) ...
18.96 MW
(Estimated)
Titanium Road, Swansea SA5 4SG (2 components)

New build CMU employing reciprocating engines running on natural gas.The Financial Commitment Milestone has been achieved for a previous auction. The site will generate at unity and therefore a power …

Inactive • 2017-18 (T-1)
No capacity data
(De-rated)
Titanium Road, Swansea, SA5 4SG (2 components)

Gas fired reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
19.00 MW
(Estimated)
Titanium Road, Waunarlwydd, Swansea, SA5 4NH (3 components)
• New build site with gas reciprocating engines to replace diesel plant
• New gas reciprocating engines to be installed and/or existing plant to be refurbished/replaced to operate on green bio-fuel.
Active • 2028-29 (T-4), 2027-28 (T-4)
18.87 MW
(Estimated)
Titanium Road, Waunarlwydd, Swansea, SA5 4SG (9 components)
• Gas fired reciprocating engines
• Gas fired reciprocating engines.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
No capacity data
(De-rated)
Loading map...
Showing 16 locations