Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "POOL WATFORD ROAD BUXTON DERBYSHIRE SK17"

0 unique locations (0 components)

Battery Storage, Keel Drive, Slough, SL1 2YA (4 components)
• A 20MW New Build Battery Storage site
• A 29.5MW New Build Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
Bristol Royal infirmary Marlborough Hill, Bristol BS2 8HW (6 components)

Back up generation

Inactive • 2019-20 (T-1), 2018-19 (T-1)
No capacity data
(Estimated)
Bristol Royal Infirmary, Upper Maudlin St, Bristol, BS2 8HW (12 components)

On site generation

Inactive • 2017-18 (T-1), 2016-17 (TR)
2.32 MW (Est from CMU) (part of 2.32 MW aggregated CMU)
(Estimated)
Daisymere Lane Buxton Derbyshire SK17 7JW UK (46 components)
• 2.115MW diesel reciprocating engine
• 2.116MW Diesel reciprocating engine
• 2.116MW diesel reciprocating engine
Inactive • 2018-19 (T-1), 2017-18 (T-1)
No capacity data
(Estimated)
Daisymere Lane, Buxton Derbyshire SK17 7JW UK (7 components)

2.116MW diesel reciprocating engine

Inactive • 2018-19 (T-1), 2017-18 (T-1)
No capacity data
(Estimated)
Elphinstone Research Centre Tranent, East Lothian, EH33 2NE (6 components)

Back up generation

Inactive • 2019-20 (T-1), 2018-19 (T-1)
No capacity data
(Estimated)
Elpinstone Research Centre, Elpinstone, Tranent EH33 2NE (12 components)

Onsite generation

Inactive • 2017-18 (T-1), 2016-17 (TR)
2.32 MW (Est from CMU) (part of 2.32 MW aggregated CMU)
(Estimated)
Harmsworth Quays Printing Ltd, Oliver Road, GRAYS, RM20 3ED (5 components)

Back up generation

Inactive • 2019-20 (T-1), 2018-19 (T-1)
No capacity data
(Estimated)
Harmsworth Quays Printing Ltd, Oliver Road, GRAYS, RM20 3ED (12 components)

Onsite generation

Inactive • 2017-18 (T-1), 2016-17 (TR)
2.32 MW (Est from CMU) (part of 2.32 MW aggregated CMU)
(Estimated)
Kestrel Road, Manfield, Nottingham, NG18 5FJ (4 components)

New reciprocating genset in acoustic enclosure

Inactive • 2022-23 (T-4), 2020-21 (T-4)
No capacity data
(Estimated)
TBD (45 components)
• Aggregation of several flexible industrial loads
• Aggregation of several flexible industrial loads and permitted on-site generation.
• Load reduction upon instruction
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Loading map...
Showing 12 locations