Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "POOL WATFORD ROAD BUXTON DERBYSHIRE SK17"

1 unique locations (11 components)

POOL WATFORD ROAD BUXTON DERBYSHIRE SK17 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.33 MW
(Estimated)
Blandford Road, Poole, BH16 6AB (6 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
23.04 MW
(Estimated)
Elsham wold industrial estate, the flarepath, north lincs, DN20 0SP (6 components)

BTM battery

Inactive • 2019-20 (T-1), 2018-19 (T-1)
1.32 MW
(De-rated)
Land west of Cheston Road, Birmingham, B7 5EU (2 components)

3 x 2MW gas fuelled generator units to be installed on a compound on industrial land west of Cheston Road.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.70 MW
(Estimated)
Mill Lane, Kirkby in Ashfield, NG17 9LG (3 components)

5 x2MW gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2019-20 (T-1)
9.51 MW
(De-rated)
NMB minebea ltd, Doddington road, linc, LN6 3RA (5 components)

BTM Battery

Inactive • 2019-20 (T-1), 2018-19 (T-1)
1.32 MW
(De-rated)
Osprey, Dunslow road, Eastfield, Scarborough, North Yorks, YO11 3UT (5 components)

BTM battery

Inactive • 2019-20 (T-1), 2018-19 (T-1)
1.32 MW
(De-rated)
Sallow Rd, Weldon Ind Est, Corby Northants, NN17 5JX (13 components)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network.

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
39.51 MW
(Estimated)
TBD (45 components)
• Aggregation of several flexible industrial loads
• Aggregation of several flexible industrial loads and permitted on-site generation
• Aggregation of several flexible industrial loads and permitted on-site generation.
• ... and 1 more unique description
DSR Not Prequalified
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
61.33 MW
(Estimated)
Loading map...
Showing 11 locations