Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "PO9"

29 unique locations (161 components) - Page 1 of 2

Asda Havant, Larchwood Avenue Bedhampton PO9 3QW (8 components)
• Load drop (4)
• Load curtailment from refridgeration
DSR Part of RESERVE POWER HOLDINGS (JERSEY) LIMITED FLEXITRICITY LIMITED PO9
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.43 MW
(Estimated)
BEDHAMPTON QUAY, HARTS FARM WAY, HAVANT, HAMPSHIRE, PO9 1JN (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR Part of ENEL X INTERNATIONAL S.R.L. ENEL X UK LIMITED PO9
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
21.54 MW
(Estimated)
Bedhampton Quay, Harts Farm Way, Havant, PO9 1JN (4 components)

29 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 29*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Part of The Shell Petroleum Company Limited LIMEJUMP LTD Rejected PO9
Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(De-rated)
Boots, Havant West St - Hampshire and South Downs PO9 1PG (1 component)

Commercial sites

DSR Part of OAKTREE POWER GROUP LIMITED OAKTREE POWER LIMITED PO9
Active • 2024-25 (T-1)
0.0038 MW (Est from CMU)
(Estimated)
Brockhampton Road, Havant Pumping Station, Havant, PO9 1NU (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR Part of ENEL X INTERNATIONAL S.R.L. ENEL X UK LIMITED PO9
Inactive • 2020-21 (T-1)
No capacity data
(De-rated)
BUDDS FARM HAVANT WTW SOUTHMOOR LANE HAVANT HAMPSHIRE PO9 1JW (2 components)

Diesel Generator at Budds Farm Havant WTW

Inactive • 2016-17 (TR)
No capacity data
(De-rated)
BUDDS FARM HAVANT WTW SOUTHMOOR LANE HAVANT HAMPSHIRE PO9 1JW (2 components)

Diesel Generator at Budds Farm Havant WTW

Inactive • 2016-17 (TR)
No capacity data
(De-rated)
Castle road rowland's castle hampshire PO9 (12 components)

EV charging at residential premises

DSR EV Charging Part of Pennnat Walters (Holdings) Limited ENERSYST LIMITED PO9
Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.43 MW
(Estimated)
DURRANTS ROAD ROWLAND'S CASTLE HAMPSHIRE PO9 (12 components)

EV charging at residential premises

DSR EV Charging Part of Pennnat Walters (Holdings) Limited ENERSYST LIMITED PO9
Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.43 MW
(Estimated)
Finchdean Road ROWLAND'S CASTLE HAMPSHIRE PO9 (3 components)

EV charging at residential premises

DSR EV Charging Part of Pennnat Walters (Holdings) Limited ENERSYST LIMITED PO9
Inactive • 2023-24 (T-1)
3.43 MW
(Estimated)
FINCHDEAN ROAD ROWLAND'S CASTLE HAMPSHIRE PO9 (12 components)

EV charging at residential premises

DSR EV Charging Part of Pennnat Walters (Holdings) Limited ENERSYST LIMITED PO9
Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.43 MW
(Estimated)
Harts Farm Way Havant Hampshire PO9 1HS (2 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• Recently completed power plant, with associated civil works, switchgear and electrical connection.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
No capacity data
(De-rated)
Harts Farm Way Havant Hampshire PO9 1HS (4 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• Recently completed power plant, with associated civil works, switchgear and electrical connection.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
No capacity data
(De-rated)
Harts Farm Way, Havant, PO9 1HS (5 components)
• Gas fired reciprocating engines
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(De-rated)
Land at Hermitage Park, Harts Farm Way, Havant, PO9 1HS (2 components)

Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4)
No capacity data
(De-rated)
Langstone Power Generation Plant, Southmoor Lane, Havant, Hampshire, PO9 1JW (8 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines Part of Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED Not Prequalified PO9
Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.77 MW
(Estimated)
LINKS LANE ROWLAND'S CASTLE HAMPSHIRE PO9 (3 components)

EV charging at residential premises

DSR EV Charging Part of Pennnat Walters (Holdings) Limited ENERSYST LIMITED PO9
Inactive • 2023-24 (T-1)
3.43 MW
(Estimated)
OAKLANDS AVENUE ROWLAND'S CASTLE HAMPSHIRE PO9 (12 components)

EV charging at residential premises

DSR EV Charging Part of Pennnat Walters (Holdings) Limited ENERSYST LIMITED PO9
Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.43 MW
(Estimated)
Park Way, Havant, Hampshire , PO9 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
(Estimated)
Plot 2, Hermitage Park, Harts Farm Way,Havant PO9 1JU (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Part of SEMBCORP ENERGY UK LIMITED UK Energy Reserve Limited Not Prequalified PO9
Inactive • 2020-21 (T-4)
No capacity data
(De-rated)
Plot 4 Hermitage Park, Harts Farm Way, Havant, PO91FA (2 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Hermitage Park
• A new build, gas fuelled generation station
Active • 2026-27 (T-4), 2025-26 (T-4)
19.09 MW
(Estimated)
PO9 (42 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR EV Charging Part of Octopus Energy Group Limited LEVELISE LIMITED PO9
Active • 2025-26 (T-4), 2025-26 (T-1) ...
123.57 MW
(Estimated)
Ranelagh Road, Bedhampton Pump Station, Havant, PO9 1NR (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR Part of ENEL X INTERNATIONAL S.R.L. ENEL X UK LIMITED PO9
Inactive • 2020-21 (T-1)
No capacity data
(De-rated)
Southmoor Lane Havant Hampshire PO9 1JW (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines Part of Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED Not Prequalified PO9
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.75 MW
(Estimated)
Southmoor Lane, Havant, Hampshire, PO9 1JW (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) Part of Conrad Energy (Holdings) II Limited CONRAD ENERGY (DEVELOPMENTS) II LIMITED Not Prequalified PO9
Active • 2026-27 (T-4)
7.09 MW
(Estimated)
Loading map...
Showing 25 locations