Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "PO20"

17 unique locations (464 components)

Asda Manor Road PO20 0NL (10 components)
• Load curtailment from refridgeration
• Load drop
DSR Part of RESERVE POWER HOLDINGS (JERSEY) LIMITED FLEXITRICITY LIMITED PO20
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.43 MW
(Estimated)
Brick Kiln, Chinchester, PO20 1EJ (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR Part of ENEL X INTERNATIONAL S.R.L. ENEL X UK LIMITED PO20
Inactive • 2020-21 (T-1)
No capacity data
(De-rated)
Chichester Food Park, Bognor Rd, Chichester PO20 1NW, United Kingdom (66 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
105.51 MW
(Estimated)
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.71 MW
(Estimated)
Eastergate, Chinchester, PO20 3XA (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR Part of ENEL X INTERNATIONAL S.R.L. ENEL X UK LIMITED PO20
Inactive • 2020-21 (T-1)
No capacity data
(De-rated)
Grists Farm Hunston Chichester PO20 1JL (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines Part of Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED Conditional PO20
Inactive • 2022-23 (T-4)
No capacity data
(De-rated)
Level Mare Lane, Westergate Pumping Station, Chichester, PO20 3SB (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR Part of ENEL X INTERNATIONAL S.R.L. ENEL X UK LIMITED PO20
Inactive • 2020-21 (T-1)
No capacity data
(De-rated)
North Mundham, Chichester PO20 1NW, United Kingdom (23 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.69 MW
(Estimated)
Park Farm Barn, Chichester Rd, Selsey, Chichester PO20 9HP, United Kingdom (43 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
64.94 MW
(Estimated)
PO20 (34 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
DSR EV Charging Part of Octopus Energy Group Limited ATTUNE POWER LTD PO20
Active • 2027-28 (T-4), 2025-26 (T-4) ...
83.71 MW
(Estimated)
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (12 components)

Two gas CHP in a horticultural environment with no aux load

CHP and autogeneration Combined Heat and Power (CHP) Part of RESERVE POWER HOLDINGS (JERSEY) LIMITED FLEXITRICITY LIMITED PO20
Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.25 MW
(Estimated)
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (19 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
CHP and autogeneration Combined Heat and Power (CHP) Part of RESERVE POWER HOLDINGS (JERSEY) LIMITED FLEXITRICITY LIMITED PO20
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.00 MW
(Estimated)
Component has yet to be procured. (235 components)

Component has yet to be procured.

DSR Part of Peak Gen Top Co Limited ENEL X UK LIMITED PO20
Active • 2024-25 (T-4), 2023-24 (T-4) ...
252.48 MW
(Estimated)
Transco Compound Martens Road Irlam M44 5AX (2 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Part of SEMBCORP ENERGY UK LIMITED UK Energy Reserve Limited Not Prequalified PO20
Inactive • 2020-21 (T-4)
No capacity data
(De-rated)
Loading map...
Showing 14 locations