Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "PL12"

11 unique locations (25 components)

Sort by: Relevance A-Z Components MW Date
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.05 MW
BOAT CASTLE HILL FORDER SALTASH CORNWALL PL12 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
Ellbridge Lane, Ellbridge, Landulph, Saltash, Cornwall, PL12 6PU (2 components)

New Build CMU comprising of Solar PV and associated plant

Inactive • 2028-29 (T-4), 2027-28 (T-4)
6.30 MW
(Estimated)
Land at Ellbridge Farm, Ellbridge Lane, Hatt Saltash PL12 6PU (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2028-29 (T-4)
8.03 MW
Land near Ellbridge Lane, Ellbridge, Landulph, Saltash, Cornwall, PL12 6PU (1 component)

New Build CMU comprising of battery storage and associated plant

Inactive • 2027-28 (T-4)
5.34 MW
Land near Ellbridge Lane, Hatt, Saltash, PL12 6PU (2 components)
• New Build CMU comprising of Solar PV and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4)
10.57 MW
Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2027-28 (T-4)
6.50 MW
PL12 (3 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
0.06 MW
(De-rated)
Trerulefoot, Saltash, Cornwall PL12 5BW (3 components)

A new build diesel and/or gas dual fuel generating station consisting of 12 generator units of 440KW each

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
Loading map...
Showing 10 locations