Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "PE14"

11 unique locations (50 components)

Sort by: Relevance A-Z Components MW Date
Coldham Estate Windfarm, Coldham, Cambridgeshire PE14 0LX (3 components)

A Solar PV site with a capacity of 9MW.

Active • 2025-26 (T-4), 2022-23 (T-1)
No capacity data
(Estimated)
Coldham Wind Farm - A, E Coldham Peterborough March Cambridgeshire PE14 0LX England (1 component)

An onshore windfarm consisting of 8 x 2MW wind turbine generators and a maximum export capacity of 14MW.

Inactive • 2028-29 (T-4)
0.93 MW
(Estimated)
Emneth Hungate WR, EMNETH HUNGATE SERVICE WR, Moyses Bank, Marshland Smeeth, WISBECH Cambridgeshire, PE14 8HD, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
French's Road, Model Farm, Walpole, Walpole Marsh, King's Lynn and West, PE14 7JF. (4 components)
• 25MW Lithium-ion Energy Storage System
• 99.9MW Lithium-ion Energy Storage System
Inactive • 2027-28 (T-4)
28.78 MW
(Estimated)
Land at Crown Farm, adjacent to Walpole Bank Road, Walpole, PE14 7JA (2 components)
• CMU ID 22KIN4, a new build battery storage CMU
• CMU ID 23KIN4, a new build battery storage CMU
Active • 2027-28 (T-4), 2026-27 (T-4)
15.35 MW
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (11 components)

Battery storage installation to allow for the storage, importation and exportation of energy to the National Grid.

Inactive • 2021-22 (T-4)
No capacity data
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH (2 components)

A 100.000 MW / 150.000 MWh battery energy storage system

Inactive • 2028-29 (T-4), 2027-28 (T-4)
15.77 MW
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.88 MW
PE14 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4)
0.04 MW
VIEW CHURCH ROAD WALPOLE ST. PETER WISBECH CAMBRIDGESHIRE PE14 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
WALNUT ROAD WALPOLE ST. PETER WISBECH CAMBRIDGESHIRE PE14 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
Loading map...
Showing 11 locations