Search Results for "PE12"

26 unique locations (184 components)

Land To The East Of Boston Road, Holbeach PE12 7EE (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW (part of 0.05 MW aggregated CMU)
(Estimated)
Long Ln, Moulton, Spalding PE12 6PP (20 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.00 MW (Est from CMU) (part of 16.00 MW aggregated CMU)
(Estimated)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (29 components)
• Existing CCGT
• Existing CCGT to be refurbished
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2257.82 MW (Est from CMU)
(Estimated)