Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "PE12"

24 unique locations (143 components)

Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (1 component)

4 MW of demand reduction

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2019-20 (T-1)
3.37 MW (Est from CMU)
(De-rated)
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (2 components)

4 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
3.37 MW (Est from CMU)
(De-rated)
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (3 components)

0.27MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
1.00 MW (Est from CMU)
(De-rated)
Asda Boston, Unit 2 Welland Business Park, Clay Lake, Spalding PE12 6BL (5 components)

Load reduction on site supported by non-exporting standby generation. (3)

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
2.37 MW (Est from CMU)
(De-rated)
Broadgate Whaplode Drove Spalding PE12 0TN (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Battery Hallen Energy Ltd Not Prequalified PE12
Inactive • 2021-22 (T-4)
0.36 MW
(De-rated)
Land adjacent O A Taylor & Sons Bulbs Limited Washway House Farm Washway Road Holbeach PE12 7PP (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Battery Less Waste Limited Not Prequalified PE12
Inactive • 2021-22 (T-4)
1.79 MW
(De-rated)
Land off B1165 Spalding PE12 8PT (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Battery DRAX POWER LIMITED Not Prequalified PE12
Inactive • 2021-22 (T-4)
1.79 MW
(De-rated)
Land To The East Of Boston Road, Holbeach PE12 7EE (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
(Estimated)
Land to the south of centenary way, Sutton Bridge, PE12 9TF (3 components)
• CMU is a photovoltaic system
• Sutton Bridge MPAN ID: 1170001824960 CMU is a photovoltaic system connected to the transmission system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.75 MW
(Estimated)
Long Ln, Moulton, Spalding PE12 6PP (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.46 MW
(Estimated)
Marsh Road, Spalding PE12 6HA (3 components)

Long or short term temperature controlled storage

Inactive • 2017-18 (TR)
0.79 MW
(De-rated)
PE12 (44 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
22.67 MW
(Estimated)
Station Road Long Sutton Spalding PE12 9BS (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
1.07 MW
(De-rated)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (22 components)
• Existing CCGT
• Existing CCGT to be refurbished
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1081.90 MW
(Estimated)
Sutton Bridge STW, SUTTON BRIDGE STW, Avenue Farm Road, Sutton Bridge, LINCOLN, PE12 9QF, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.80 MW
(De-rated)
WESTON WB, High Road, Weston, Lincolnshire, PE12 6HZ (9 components)

Diesel Generator, Perkins, 3012TAG2A

Inactive • 2017-18 (T-1), 2016-17 (TR)
0.71 MW
(Estimated)
Weston WB, WESTON WB, High Road, Weston, SPALDING Lincolnshire, PE12 6RA, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.85 MW
(De-rated)
Whelley Hill Farm Battery Storage Scheme, Worset Lane, Hart, Hartlepool, TS27 3BH. (1 component)

A 4.8MW Battery Energy Storage System.

Inactive • 2021-22 (T-4)
1.75 MW
(De-rated)
Loading map...
Showing 18 locations