Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "NN9"

6 unique locations (57 components)

Asda, Scalley Way Raunds NN9 6EQ (10 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
24.41 MW (Est from CMU) (part of 24.41 MW aggregated CMU)
(Estimated)
NN9 (42 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
155.99 MW (Est from CMU) (part of 155.99 MW aggregated CMU)
(Estimated)
West St, Stanwick, Wellingborough , Northants, NN9 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
(Estimated)
St. Georges Park, Binfield, BRACKNELL, BERKSHIRE, RG42 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
No capacity data
(Estimated)
Loading map...
Showing 4 locations