Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "NN18"

35 unique locations (363 components)

Land at Enterprise Court, Corby, NN18 8ES (65 components)

Reciprocating genset

Active • 2028-29 (T-4), 2027-28 (T-4) ...
48.47 MW
(Estimated)
Land at Enterprise Court Geddington Rd, Geddington, Corby, NN18 8ES (2 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
0.61 MW
(Estimated)
NN18 (17 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
12.71 MW
(Estimated)
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FT (3 components)
• 1x MWM TCG 2020
• Gas fired generating unit
Inactive • 2018-19 (T-1), 2017-18 (T-1)
No capacity data
(De-rated)
Toray 2, Toray Textiles, Import Way Crown Farm Way Mansfield NG19 0FT (2 components)

1 x MWM TBG 620V 16K

Part of Alkane Energy Limited ALKANE ENERGY UK LIMITED NN18
Inactive • 2017-18 (T-1)
No capacity data
(De-rated)
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FT (3 components)
• 1 x MWM TGC 2020
• Gas fire generating unit
Inactive • 2018-19 (T-1), 2017-18 (T-1)
No capacity data
(De-rated)
Loading map...
Showing 6 locations