Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "NG24"

13 unique locations (55 components)

Sort by: Relevance A-Z Components MW Date
Asda Newark, Off Lombard Street NG24 1XG (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
No capacity data
Boots, Newark Stodman St - South Lincs and North Cambs NG24 1AT (1 component)

Commercial sites

Active • 2024-25 (T-1)
No capacity data
Cotham Grange PV Cotham Lane HAWTON Nottinghamshire NG24 3RJ (2 components)

50 MW solar photovoltaic plant commissioned on 18/01/21. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
4.62 MW
(Official)
Digital Space Group, Brunel Drive, Jessop Cl, Newark NG24 2AG (3 components)

0.28MW - 0.34 MWh Battery Energy Storage System

Active • 2025-26 (T-4), 2022-23 (T-1)
0.00 MW
(Estimated)
Jericho Works,Bowbridge Lane, New Balderton, Newark, Nottinghamshire NG24 3BZ (2 components)

Industrial plasters manufacturing

Inactive • 2017-18 (TR)
No capacity data
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (3 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
10.79 MW
(Official)
Land off Bowbridge Lane, Balderton, Newark NG24 3BY (6 components)
• 4 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Bowbridge Lane
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.66 MW
Newark Industrial Estate, NEWARK, Nottinghamshire, NG24 2ER, United Kingdom (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2026-27 (T-4), 2024-25 (T-4) ...
No capacity data
Loading map...
Showing 8 locations